(a) Building Fees:
(1) All new residential 1, 2, and 3 family dwellings: $50.00 base fee, plus $25.00 per 100 square feet of all floor area including basement, attics and garage areas.
(2) Residential 1, 2, and 3 family, remodeling, additions, alterations and repairs: $50.00 base fee, plus $.09 per square foot of area. Detached Garages : $150.00 Flat rate. Decks, play structures, arbors, fences, sheds, driveways, retaining walls, and all other accessory structures: $55.00 flat rate.
(3) All new commercial, assembly or multi-family buildings and additions: $100.00 base fee, plus $50.00 per 100 square feet of floor area.
(4) Commercial, assembly, multi-family remodeling, alterations, and repairs: $100.00 base fee, plus $ 50.00 per 100 square foot of floor area including basement and garage areas.
(b) Electrical Permit Fees:
(1) Residential 1, 2, and 3 family buildings: $50.00 base fee, plus $1.00 per outlet, fixture, plus $15.00 per panel, service, or motor.
(2) Commercial, assembly, or multi-family buildings: $100.00 base fee, plus $2.00 per outlet, fixture, plus $35.00 per panel, service, transformer, motor.
(3) All Solar Panel installations or additions to existing solar arrays $ 150.00.
(4) All Generator installations or removals base fee plus $ 25.00 per unit.
(c) Plumbing Permit Fees:
(1) Residential 1, 2, and 3 family buildings: $60.00 base fee, plus $5.00 per fixture, appliance, floor drain, hot water tank.
(2) Residential 1, 2, and 3 family buildings: $60.00 base fee, plus $5.00 per one hundred (100) foot increment of exterior sewer, gas, or waterline.
(3) Commercial, assembly, or multi-family buildings: $125.00 base fee, plus $5.00 per fixture, appliance, floor drain, hot water tank.
(4) Commercial, assembly, or multi-family buildings: $70.00 base fee, plus $5 per, one hundred (100) foot increment of exterior sewer, gas, or waterline.
(d) Heating and Air Conditioning Permit Fees:
(1) Residential 1, 2, and 3 family buildings: $50.00 base fee, plus $15.00 per heating and air conditioning unit.
(2) Commercial, assembly, or multi-family buildings: $125.00 base fee, plus $50.00 per heating and air conditioning and air handling unit.
(3) Type l hood: Base fee plus Fifty Dollars ($50.00) per each
(4) Type II hood: Base fee plus Twenty-Five Dollars ($25.00) per each.
(5) Each Geothermal Unit installation: $150.00
(e) Paint Removal and Exterior Surface Cleaning Permit Fees: $35.00 application fee plus deposits as required under Section 1374.02(b).
(f) Fire Sprinkler System Permit Fees:
(1) Residential: $25.00 base fee, plus $1.00 per sprinkler head.
(2) Commercial: $50.00 base fee, plus $1.00 per sprinkler head.
(3) Commercial Kitchen Hood Fire System: $75.00
(g) Fire Alarm Systems Permit and Inspection Fees.
(1) Residential 1, 2, and 3 family buildings, household fire alarm installation fee: $25.00; combination alarm system with fire alarm: $25.00 base fee, plus alarm user permit fee. (See Section 701.03)
(2) Commercial, assembly, or multi-family fire alarm system: $50.00 base fee plus $1.00 per device. Note: Commercial, assembly, or multi-family combination fire and security alarms systems are not permitted for life safety.
(Ord. 25-14. Passed 6-9-14; Ord. 90-19. Passed 12-16-19.)
(h) Waterproofing Permit Fees: $ 55.00 flat fee.
(i) Pools and Hot Tubs Permit Fees:
(1) Above ground heated - $55.00.
(2) In ground - $150.00
(j) Dumpster Permit Fees: $45.00 Flat Rate and shall be allowed on-site for a maximum of 15 days unless associated with a building permit.
(k) Storage pod Permit Fees: $45.00 Flat Rate and shall be allowed on-site a maximum of 15 days.
(l) Commercial Signs Permit Fees: New, modifications or alterations: $50.00 base fee, plus $4.00 per square foot of sign area.
(Ord. 130-08. Passed 12-22-08; Ord. 79-16. Passed 12-19-16; Ord. 90-19. Passed 12-16-19; Ord. 26-21. Passed 5-24-21.)