§ 52.09 NEW CONSTRUCTION.
   (A)   All buildings proposing to connect to the public water system of the city receiving building permits, on or after the effective date of this chapter, shall be equipped with an approved and tested as properly functioning backflow prevention device(s), as prescribed herein, prior to the issuance of a certificate of occupancy for that building.
   (B)   If a building permit was issued for the building prior to the effective date of this chapter or a building permit was not required, the building shall be considered to be an existing building prior to the effective date, in accordance with § 52.05.
(Prior Code, § 51.104) (Ord. passed 8-10-1993)