9-2-6-11: BUFFER OR SETBACK REQUIREMENTS:
Notwithstanding any other requirements of this title, when a road easement or driveway is provided on a lot, there must be established a buffer or setback between said road easement or driveway of at least twenty feet (20') from the side lot line of the nearest adjoining lot, except that the width of the buffer or setback may be reduced to fifteen feet (15') to accommodate a driveway apron in that part of the driveway located in the street right of way or street easement but the buffer or setback shall be restored to twenty feet (20') beyond the apron. (Ord. 06-1-1, 1-17-2006)