8-3-1: SAFE SITE MANAGEMENT PRACTICES:
Any permittee engaged in construction for which a site preparation permit, building permit or site development permit is issued shall keep and observe and shall cause its contractors, agents and employees to keep and observe the following requirements:
   A.   All construction and building sites shall be kept and maintained free and clear of debris and refuse generated by site preparation, construction, reconstruction or demolition of buildings and structures.
   B.   Construction debris and refuse containment shall be required for all job sites. Containment shall occur on the property that is the subject of the permit, and shall be within a dumpster, structure, or container that can be covered to prevent windblown debris. All such dumpsters, structures, or containers shall be covered at all times when no work is being performed on the property that is the subject of the permit.
   C.   When dumpsters are provided they shall be located on private property and set back so as not to encroach on an interior side yard, as defined by the Riverwoods zoning ordinance as amended.
   D.   Soil erosion and sediment control measures shall be provided and maintained as required by the village engineer.
   E.   As required by the state of Illinois plumbing code, in the case of new construction or major renovation work when existing sanitary facilities are not yet available, the construction sites shall be provided a portable toilet. The portable toilet shall be provided not later than immediately after completion of excavation of the foundation. The location of the portable toilet shall be set back a minimum of six feet (6') from all property lines. (Ord. 07-4-6, 4-17-2007)