(A) Septic tank and grease trap waste may be introduced into the POTW only at locations designated by the Director, and at such times as are established by the Director. Such waste shall not violate § 58.081 or any other requirements established by the Director. The Director shall require septic tank and grease trap waste haulers to obtain wastewater discharge permits.
(B) The Director shall require haulers of industrial waste to obtain wastewater discharge permits. The Director may require generators of hauled industrial waste to obtain wastewater discharge permits. The Director also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this chapter.
(C) All waste haulers may discharge loads only at locations designated by the Director. No load may be discharged without prior consent of the Director. The Director may collect samples of each hauled load to ensure compliance with applicable standards. The Director may require the industrial waste hauler to provide a waste analysis of any load prior to discharge.
(D) All waste haulers must provide a waste-tracking form for every hauled load. This form shall include, at a minimum, the name and address of the waste hauler, names and addresses of sources of waste, and volume of waste. The form shall be signed by a representative of the source and a representative of the hauler.
(E) Damage to facilities, see § 58.052.
(Prior Code, § 54.35)