Loading...
16.24.030 NOTIFICATION OF ENGINEER REQUIRED.
   Grading and improvement work shall not be commenced until the city engineer has been notified in writing seven days in advance, and if work has been discontinued for any reason, it shall not be recontinued until the city engineer has been notified. (Ord. 89 § 6.1(b), 1955).
16.24.040 REQUIRED IMPROVEMENTS.
   All required improvements shall be constructed under the inspection of and to approval of the city engineer. Cost of inspection shall be paid by the subdivider as established by resolution of the City Council . (Ord. 89 § 6.1(c), 1955).
16.24.050 SERVICE CONNECTIONS.
   All underground utilities, sanitary sewers, storm drains and culverts installed in streets, service roads, alleys or highways, shall be constructed prior to the surfacing of such street service roads, alleys, or highways. Service connections for all underground utilities and sanitary sewers shall be placed to such length as will obviate the necessity for disturbing the street or alley improvements when service connections thereto are made. Roadway subdrains shall be installed when requested by the city engineer prior to placing of the crusher run base. (Ord. 89 § 6.1(d), 1955).
16.24.060 COMPLIANCE WITH CHAPTER – APPROVAL BY ENGINEER.
   The subdivider, his or her engineer and his or her contractor shall develop plans and complete all improvement work in accordance with the provisions of this chapter and to the approval of the city engineer. (Ord. 89 § 6.1(e), 1955).
16.24.070 REQUIRED CHANGES.
   The subdivider shall install improvements in accordance with the general requirements set forth in this chapter; provided, that the city engineer may require changes in typical section and details if unusual conditions due to soil conditions arise during construction to warrant such change; such changes to be at the expense of the subdivider. (Ord. 89 § 6.2(part), 1955).
Loading...