All improvements mentioned in this chapter shall conform to those required in the “Standard Improvement Specifications” prepared by the city engineer, recommended by the planning commission, and adopted by the
City Council
, copies of which are on file in the office of the City Clerk and the city engineer. (Ord. 89 § 6.1 (part), 1955).
Grading and improvement work shall not be commenced until plans and profiles for such work have been submitted to and approved by the city engineer. Such plans may be required before approval of the final map. All such plans and profiles shall be prepared on tracing cloth in accordance with requirements of the city engineer. All such plans and profiles shall be prepared by a registered civil engineer. (Ord. 89 § 6.1(a), 1955).
Grading and improvement work shall not be commenced until the city engineer has been notified in writing seven days in advance, and if work has been discontinued for any reason, it shall not be recontinued until the city engineer has been notified. (Ord. 89 § 6.1(b), 1955).
All underground utilities, sanitary sewers, storm drains and culverts installed in streets, service roads, alleys or highways, shall be constructed prior to the surfacing of such street service roads, alleys, or highways. Service connections for all underground utilities and sanitary sewers shall be placed to such length as will obviate the necessity for disturbing the street or alley improvements when service connections thereto are made. Roadway subdrains shall be installed when requested by the city engineer prior to placing of the crusher run base. (Ord. 89 § 6.1(d), 1955).
The subdivider shall install improvements in accordance with the general requirements set forth in this chapter; provided, that the city engineer may require changes in typical section and details if unusual conditions due to soil conditions arise during construction to warrant such change; such changes to be at the expense of the subdivider. (Ord. 89 § 6.2(part), 1955).