A. In order to reduce runoff and encourage healthy plant growth, a soil management report shall be completed by the project applicant, or his/her designee, as follows:
1. Submit soil samples to a laboratory for analysis and recommendations.
a. Soil sampling shall be conducted in accordance with laboratory protocol, including protocols regarding adequate sampling depth for the intended plants.
b. The soil analysis may include:
i. Soil texture;
ii. Infiltration rate determined by laboratory test or soil texture infiltration rate table;
iii. pH;
iv. Total soluble salts;
v. Sodium;
vi. Percent organic matter; and
vii. Recommendations.
c. In projects with multiple landscape installations (i.e. production home developments), a soil sampling rate of one (1) in seven (7) lots or approximately fifteen percent (15%) will satisfy this requirement. Large landscape projects shall sample at a rate equivalent to one (1) in seven (7) lots.
2. The project applicant, or his/her designee, shall comply with one (1) of the following:
a. If significant mass grading is not planned, the soil analysis report shall be submitted to the City of Pinole as part of the Landscape Documentation Package; or
b. If significant mass grading is planned, the soil analysis report shall be submitted to the City of Pinole as part of the Certificate of Completion.
3. The soil analysis report shall be made available, in a timely manner, to the professionals preparing the landscape design plans and irrigation design plans to make any necessary adjustments to the design plans.
4. The project applicant, or his/her designee, shall submit documentation verifying implementation of soil analysis report recommendations to the City of Pinole with Certificate of Completion.
(Ord. 2020-05 § 2(part), 2020; Ord. 2009-11 § 1(part), 2009).