1056.03 CONNECTIONS IN NEW DEVELOPMENTS OR BUILDINGS UNDER CONSTRUCTION.
   (a)   Every person, firm or corporation who or which is the developer or builder of any area within the Municipality shall, at the time that basement footers or foundation footers are constructed, install the sanitary sewers into the foundation. Floor drains and waste pipe drains shall be stubbed off, within the house, at a height of three feet from the ground level, measured within the basement or foundation, and shall be capped or sealed with a water-tight cap or seal to the satisfaction of the Municipality.
   (b)   No developer or builder, or any agent thereof, shall remove the cap or seal, or permit the entry of water or any liquid into the sanitary sewer prior to the completion of the plumbing lines. If the Municipality determines that a sanitary sewer opening has not been capped or sealed or that the cap or seal has been removed or that water, liquids or other extraneous material has entered the sanitary sewer, the holder of the zoning permit shall be prima-facie liable for a violation of this section.
(Ord. 2000-40. Passed 6-6-00.)