13.10.200: MONITORING FACILITIES:
   A.   Each user shall provide and operate at the user’s own expense, a monitoring facility to allow inspection, sampling and flow measurement of each sewer discharge to the city. Each monitoring facility shall be situated on the user’s premises; except, where such a location would be impractical or cause undue hardship on the user, the city may concur with the facility being constructed in the public street or sidewalk area; provided, that the facility is located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling facility to allow accurate sampling and preparation of samples for analysis. The facility’s sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. Where required by federal or state regulations, such monitoring facilities shall be provided at the end of a process or production unit from which regulated toxic pollutants are discharged.
   B.   All monitoring facilities shall be constructed and maintained in accordance with all applicable construction standards and specifications. Construction shall be completed within one hundred twenty (120) days of receipt by the user of the indirect discharge permit unless the city, for good cause, extends the time period. (Ord. 1526 § 8, 2023: Ord. 1056, 1992)