1541.06   FINAL INSPECTION; AUTHORITY OF BUILDING COMMISSIONER.
   (a)   Final inspection of the plant shall be made after the whole is connected up and ready to operate, but before any fire has been started, and the contractor shall notify the Building Commissioner when the same is completed.
    (b)   Upon the exterior casing in a conspicuous position there shall be a plate or other permanent device securely and permanently attached thereto, giving the name and address of the installer.
    (c)   No person shall lath or plaster over or cover up any warm air heating before the work has been inspected and the aforementioned label has been attached. An inspector from the Division of Buildings shall have the right and authority to remove or order removed all such lath, plaster or other covering which may have been placed over the work before the same has been inspected.
(Ord. 421-47. Passed 4-7-47.)