1529.06   SURVEY OF LOT; STAKING OF LOT LINES.
   (a)   Each application for a building permit for buildings to be erected along street lines and within less than eighteen inches of the same shall, unless the requirements of this section can be shown without confusion on the situation plan, be accompanied by a plat of the survey of the lot, showing the figured length of the lines, the grades and the elevation of the curb and sidewalk along such street lines, and the reference points and dimensions for establishing all the lot lines. The street lines, elevations and reference points shall be checked, verified and certified by the City Engineer, who, when he deems it necessary or when requested by an applicant for a building permit, shall establish the lines and grades upon the ground.
(Ord. 1177. Passed 3-3-30.)
   (b)   Prior to final inspection of any new structure and occupancy thereof, it shall be determined that the property corners are plainly designated with iron pins and white wooden stakes, such wooden stakes to plainly indicate the sublot number of each parcel of land.
(Ord. 131-62. Passed 12-17-62.)