(a) When a permit is issued, one set of drawings and specifications shall be stamped by the Building Commissioner and shall then be filed in the Division of Buildings, and one set so stamped shall be returned to the applicant, which latter set of drawings shall be kept at the building or work until such building or work is completed.
(Ord. 1177. Passed 3-3-30.)