(a) Subject to the provisions of subsection (d) hereof, the Planning Commission shall establish that the performance standards outlined in Section 1177.07 shall be complied with before approving the plans. Drawings and a report adequate to show that the proposed development will comply with such performance standards shall be submitted.
(b) Subject to the provisions of subsection (d) hereof, the preliminary and final site development plans as required by Chapter 1105 shall show the layout of the proposed system of drives and other facilities for circulation of vehicular and pedestrian traffic, including delivery trucks; details for connections to present streets; the type of pavement; and locations of sidewalks, crosswalks and walkways.
(c) No use or occupancy shall be permitted until the development for which a building permit has been issued is completed and an occupancy certificate is obtained from the Building Commissioner, as provided in the Building Code.
(d) To accommodate the necessary flexibility required to attract industry to the Industrial Park District, the preliminary and final site development plans may indicate lot lines within each industrial park which are subject to change so as to allow smaller or larger lot dimensions than are shown on the preliminary and final site development plans, and the Planning Commission shall approve lot splits requested by a landowner for such smaller or larger lot dimensions, provided that the minimum lot size and width requirements set forth in Section 1177.05 are observed.
(Ord. 73-97. Passed 4-7-97.)