1105.05   SOIL SURVEY AND STABILIZATION REPORT.
   Prior to final approval by the Planning Commission and prior to construction, a Soil Survey and Stabilization Report relating to the suitability of site development must be submitted to the Planning Commission. After review of the initial survey report, any additional testing or information, including, for example, cross-sections, must be submitted upon request of the Planning Commission or the City Engineer after a determination by the City Engineer that such additional information is required. All reports must be prepared by a registered engineer experienced in the field of geotechnical engineering.
(Ord. 125-96. Passed 7-1-96.)