1103.08   FEE FOR ENGINEERING INVESTIGATION AND APPROVAL OF IMPROVEMENTS AND DEVELOPMENT PLANS.
   The owner of land within a subdivision to be developed for street dedication to the City shall pay to the City eighty dollars ($80.00) per lot for the first fifty lots, and fifty dollars ($50.00) per lot for each lot over fifty lots. Such fee shall be payable in two equal installments, one-half upon submittal of plans, and one-half prior to approval for construction. This fee is to cover the necessary investigations by the City Engineer to determine the conformity of the proposed subdivision with the requirements of this Planning and Zoning Code and all engineering involved, in seeing that the improvements provided for herein are performed in accordance with the requirements of such Code and other City ordinances. The above-stated fee shall be in addition to the amount required to be paid for field inspection of construction of improvements as provided in Section 1105.99.
(Ord. 166-59. Passed 9-21-59; Ord. 211-92. Passed 10-13-92.)