Loading...
A person seeking a transfer station permit must first establish compliance with the Comprehensive Zoning Ordinance. Upon compliance being established, a solid waste facility permit application shall be submitted to the Coordinator setting forth the following information:
(A) Statement of the exact nature and source of the materials to be disposed of on the subject property, the length of time the materials will remain on site, and the ultimate destination of said materials.
(B) A site plan showing the following:
(1) The entire property, principal structures, accessory buildings, location of solid waste, traffic patterns, and paved areas;
(2) All natural or historic features including, but not limited to, streams, topography, cemeteries, and endangered species habitats;
(3) Methods employed to control illegal dumping, odors, and fires; and
(4) An operations plan which includes record keeping, reporting, containment procedures, capacity assurance, and closure procedures.
(Ord. KOC 24-830-409, passed 5-21-2024)
A person seeking a solid waste incinerator permit must first establish compliance with the Comprehensive Zoning Ordinance. Upon compliance being established, a solid waste facility permit application shall be submitted to the Coordinator setting forth the following information:
(A) Statement of the exact nature and source of the materials to be incinerated, the length of time the materials and resulting waste will remain on site, and the ultimate destination of residuals.
(B) A site plan showing the following:
(1) The entire property, principal structures, accessory buildings, location of solid waste, traffic patterns, and paved areas;
(2) All natural or historic features including, but not limited to, streams, topography, cemeteries, and endangered species habitats;
(3) Methods employed to control air pollutants, odors, and fires; and
(4) An operations plan which includes record keeping, reporting, containment procedures, and closure procedures.
(Ord. KOC 24-830-409, passed 5-21-2024)
A person seeking a commercial composting facility permit must first establish compliance with the Comprehensive Zoning Ordinance. Upon compliance being established, a solid waste facility permit application shall be submitted to the Coordinator setting forth the following information:
(A) Statement of the exact nature and source of the materials to be disposed of on the subject property.
(B) A site plan showing the following:
(1) The entire property, principal structures, accessory buildings, location of and method of composting, traffic patterns, and paved areas;
(2) All natural or historic features including, but not limited to, streams, topography, cemeteries, and endangered species habitats;
(3) Methods employed to control surface drainage, illegal dumping, and fires; and
(4) An operations plan which includes record keeping, reporting, containment procedures, capacity assurance, and closure procedures.
(Ord. KOC 24-830-409, passed 5-21-2024)
A person seeking a hazardous waste disposal facility permit must first establish compliance with the Comprehensive Zoning Ordinance. Upon compliance being established, a hazardous waste disposal facility permit application shall be submitted to the Coordinator setting forth the following information:
(A) Statement of the exact nature and source of the materials to be disposed of at the subject property.
(B) A site plan showing the following:
(1) The entire property, principal structures, accessory buildings, and paved areas;
(2) All natural or historic features including, but not limited to, streams, topography, cemeteries, and endangered species habitats;
(3) Methods employed to control surface drainage, illegal dumping, and fires; and
(4) An operations plan which includes record keeping, reporting, location, containment, sortation, and disposal of materials.
(Ord. KOC 24-830-409, passed 5-21-2024)
A person seeking a landfarming facility permit must first establish compliance with the Comprehensive Zoning Ordinance. Upon compliance being established, a landfarming facility permit application shall be submitted to the Coordinator setting forth the following information:
(A) Statement of the exact nature, degree of contamination, and source of the soil to be treated on the subject property.
(B) A site plan showing the following:
(1) The entire property, principal structures, accessory buildings, location of soil treatment, and paved areas;
(2) All natural or historic features including, but not limited to, streams, topography, cemeteries, and endangered species habitats;
(3) Methods employed to control surface drainage, and illegal dumping; and
(4) An operations plan which includes record keeping, reporting, containment procedures, capacity assurance, and closure procedures.
(Ord. KOC 24-830-409, passed 5-21-2024)
PERMITS
No person or entity shall engage in the business of collection, transporting, disposal, storage, or processing of solid waste generated within the county without a permit secured from the local, state, or federal agency which oversees said waste.
(Ord. KOC 24-830-409, passed 5-21-2024)
Prior to issuance of a permit to collect, transport, dispose of, store, or process solid waste generated within the county, an application must be completed and submitted with the permit fee to the local, state, or federal agency which oversees said waste.
(Ord. KOC 24-830-409, passed 5-21-2024)
If the application shows that the applicant will collect, transport, store, and/or process solid waste without hazard to the public health or damage to the environment and in compliance with the laws of the federal government, the State of Kentucky, the Comprehensive Zoning Ordinance, and this chapter, the local, state, or federal agency which oversees said waste may issue the appropriate permit. If modifications are necessary to the application regarding service, equipment, reporting of activity, or mode of operation so as to bring the application into compliance, the local, state, or federal agency which oversees said waste shall notify the applicant in writing, setting forth the modification to be made and the time in which it shall be done.
(Ord. KOC 24-830-409, passed 5-21-2024)
Loading...