(A) Pollution prevention plan, required by 9 VAC § 25-870-56, shall be developed, implemented, and updated as necessary and must detail the design, installation, implementation, and maintenance of
effective pollution prevention measures to minimize the discharge of pollutants. At a minimum, such measures must be designed, installed, implemented, and maintained to:
(1) Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge;
(2) Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater; and
(3) Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures.
(B) The pollution prevention plan shall include effective best management practices to prohibit the following discharges:
(1) Wastewater from washout of concrete, unless managed by an appropriate control;
(2) Wastewater from washout and clean out of stucco, paint, form release oils, curing compounds, and other construction materials;
(3) Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and
(4) Soaps or solvents used in vehicle and equipment washing.
(C) Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, are prohibited unless managed by appropriate controls.
(1998 Code, § 18-57) Penalty, see § 153.99