(a) All the provisions of Chapter 1466 – Flood Damage Reduction; Chapter 1488 – Controlling Construction Site Soil Erosion, Sediment and other Wastes and Storm Water Runoff; Chapter 1490 – Controlling Post – Construction Water Quality Runoff; and Chapter 1492 – Controlling Riparian Setbacks and Wetlands Setbacks shall be complied with.
(b) These regulations are not intended to repeal any existing ordinances (resolutions) including subdivision regulations, zoning or building codes. In the event of a conflict between these regulations and any other ordinance (resolution), the more restrictive shall be followed.
(Ord. 05-79. Passed 6-7-05.)