1462.07 RESIDENTIAL CONCRETE DRIVE: PLANT AND CONTRACTOR'S REPORT.
   (a)   In any construction within the application of this chapter, all supplies shall, at the time of loading for delivery to a user, complete a form entitled the Residential Concrete Drive: Plant and Contractor's Report. Part I shall state:
      (1)   Delivery destination;
      (2)   Size of load;
      (3)   Concrete mix;
      (4)   Air entrainment;
      (5)   Amount of water added at plant;
      (6)   Admixture added;
      (7)   Amount of calcium chloride added; and
      (8)   Time of truck loading.
   (b)   In any construction within the application of this chapter, the contractor or his or her agent shall complete a form entitled the Residential Concrete Drive: Plant and Contractor's Report. Part II shall state:
      (1)   The address or sublot number of the pour location;
      (2)   The time of arrival;
      (3)   The time of pour;
      (4)   The name of the builder or user;
      (5)   The name of the cement contractor or user;
      (6)   The amount of water at the time of pour;
      (7)   The area temperature at the time of pour; and
      (8)   The curing compound used and the type of sealer used.
   (c)   An original and two copies of the Report shall be signed by the individuals completing the report. Such persons do, by affixing their signatures to this Report, warrant that the statements contained therein are true under penalty of law. The original shall be sent to the Building Commissioner, a copy shall be sent to the builder and a copy shall be retained by the supplier.
(Ord. 1984-112. Passed 7-5-84.)