(A) Water tap fees are listed in the town’s fee schedule.
(B) For contractor installed taps, there shall be a meter installation and inspection fee (facility fee) as listed in the town’s fee schedule.
(C) Sewer tap fees are listed in the town’s fee schedule.
(D) Water and sewer taps in excess of six feet in depth shall be charged at a rate as listed in the town’s fee schedule. This fee shall be paid prior to a certificate of occupancy being issued or service established.
(E) (1) If a bore is necessary there shall be a fee as listed in the town’s fee schedule.
(2) This fee shall be paid prior to a certificate of occupancy being issued or service established.
(F) If a road cut is necessary, there shall be a fee as listed in the town’s fee schedule. This fee shall be paid prior to a certificate of occupancy being issued or service established.
(Effective 7-1-2014)