Skip to code content (skip section selection)
Compare to:
Murrieta Overview
Murrieta, CA Municipal Code
Murrieta, California Municipal Code
Preface
Title 1 GENERAL PROVISIONS
Title 2 ADMINISTRATION AND PERSONNEL
Title 3 REVENUE AND FINANCE
Title 4 (RESERVED)
Title 5 BUSINESS LICENSES AND REGULATIONS
Title 6 ANIMALS
Title 7 (RESERVED)
Title 8 HEALTH AND SAFETY
Title 9 PUBLIC PEACE, MORALS AND WELFARE
Title 10 VEHICLES AND TRAFFIC
Title 11 (Reserved)
Title 12 STREETS, SIDEWALKS AND PUBLIC PLACES
Title 13 PUBLIC SERVICES
Title 14 (RESERVED)
Title 15 BUILDINGS AND CONSTRUCTION
Title 16 DEVELOPMENT CODE
STATUTORY REFERENCES FOR CALIFORNIA CITIES
PRIOR CODE CROSS-REFERENCE TABLE
ORDINANCE LIST AND DISPOSITION TABLE
Loading...
15.62.020   State mandated permitting process.
   A.   Section 65850.5 of the California Government Code provides that, on or before September 30, 2015, every city, county, or city and county shall adopt an ordinance that creates an expedited, streamlined permitting process for small residential rooftop solar energy systems.
   B.   Section 65850.5 of the California Government Code provides that in developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which small rooftop solar energy systems shall comply to be eligible for expedited review. The building official is hereby authorized and directed to develop and adopt such checklist.
   C.   The checklist shall be published on the city's internet website. The applicant may submit the permit application and associated documentation to the City's building division by personal, mailed, or electronic submittal together with any required permit processing and inspection fees. In the case of electronic submittal, the electronic signature of the applicant on all forms, applications and other documentation may be used in lieu of a wet signature. (Ord. 503 § 1, 2015)
15.62.030   Pre-submittal requirements.
   Prior to submitting an application, the applicant shall:
   A.   Verify to the city's reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the small residential rooftop solar energy system is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the building foundation; and
   B.   At the applicant's cost, verify to the city's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads. (Ord. 503 § 1, 2015)
15.62.040   Inspections required.
   For a small residential rooftop solar energy system eligible for expedited review, only one inspection shall be required, which shall be done in a timely manner and may include a consolidated inspection by the building official and fire chief. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized; however the subsequent inspection need not conform to the requirements of this subsection. (Ord. 503 § 1, 2015)
15.62.050   Completed applications and permit issuance.
   An application that satisfies the information requirements in the checklist, as determined by the building official or his designee shall be deemed complete. Upon receipt of an incomplete application, the building official shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.
   Upon confirmation by the building official of the application and supporting documentation being complete and meeting the requirements of the checklist, the building official shall administratively approve the application and issue all required permits or authorizations. Such approval does not authorize an applicant to connect the small residential rooftop energy system to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider.
   The building official may require an applicant to apply for a minor use permit if the official finds, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health and safety. Such decisions may be appealed to the Planning Commission. If a minor use permit is required, the city may deny such application if it makes written findings based upon substantive evidence in the record that the proposed installation would have a specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid, as defined, the adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternative for preventing the adverse impact. (Ord. 503 § 1, 2015)