§ 54.07 PERMITEE COMPLIANCE DURING AND AFTER CONSTRUCTION.
   (A)   Changes to approved plan. Any proposed changes made to the approved plan shall be submitted to the AHJ and/or designee for review and approval and shall be subject to a revised-plan review fee in an amount established by the governing body in the AHJ’s jurisdiction from time to time. Changes made without approval may result in revocation of approval. Revocation of a Soil Erosion and Sedimentation Control (SESC) permit may also be considered. All changes in the approved plan authorized in the permit shall be submitted to the AHJ for approval prior to any work on the system or earth change.
   (B)   Storm water control plan - “as-built” drawings. Construction record drawings with specific as-built information as required by the AHJ, shall be submitted by the registered design professional to the AHJ.
   (C)   Post-construction certification. A post-construction letter of certification from a design professional certifying construction of the system in compliance with the approved plans shall be submitted to the AHJ. The AHJ is authorized to conduct inspections to ensure compliance in accordance with the procedures in § 54.08.
   (D)   Permit expiration. Permits shall expire automatically upon the project completion date provided on the permit. Permits shall also terminate automatically if construction has not commenced within one year of the date of issuance. The AHJ may extend a permit for a period not to exceed one year upon the request of the owner/developer at the AHJ’s discretion.
(Ord. 992, passed 1-12-15)