§ 54.08 INSPECTION REQUIREMENTS.
   (A)   Developments and redevelopments. The design professional responsible for the design of the storm water management system shall be required to complete an inspection report, on a form acceptable to the AHJ and certify that the system conforms with the design specified on the permit application. The design professional shall also submit as-built drawings to the AHJ. The AHJ may also require inspection of the system by AHJ personnel. These inspections may occur during or after construction as determined necessary by the AHJ or designee during the review process, and would be outlined in the letter of approval. If inspection by the AHJ is required, the owner/developer and/or design professional shall be informed at what stage of construction these inspections will be required. Subsequent inspections may be required if deficiencies exist.
   (B)   Inspection of facilities to be publicly owned. The (AHJ) may agree to incorporate facilities constructed under this chapter as part of the public drainage system upon request of the property owner. Any facilities that are to become part of the public drainage system shall be inspected by the AHJ at the time of installation. Any work which is concealed at the time of inspection shall be exposed for approval.
(Ord. 992, passed 1-12-15)