Pursuant to the purpose and methods of reducing flood damage stated in these regulations, the following additional standards are adopted to assure that the reduction of the flood carrying capacity of watercourses is minimized:
(A) Development in Floodways.
(1) In floodway areas, development shall cause no increase in flood levels during the occurrence of the base flood discharge. Prior to issuance of a floodplain development permit, the applicant must submit a hydrologic and hydraulic analysis, conducted by a registered professional engineer, demonstrating that the proposed development would not result in any increase in the base flood elevation; or
(2) Development in floodway areas causing increases in the base flood elevation may be permitted provided all of the following are completed by the applicant:
(a) Meet the requirements to submit technical data in § 157.47(A);
(b) An evaluation of alternatives which would not result in increased base flood elevations and an explanation why these alternatives are not feasible;
(c) Certification that no structures are located in areas which would be impacted by the increased base flood elevation;
(d) Documentation of individual legal notices to all impacted property owners within and outside the community, explaining the impact of the proposed action on their property; and
(e) Concurrence of the City Manager of City of Montgomery and the Chief Executive Officer of any other communities impacted by the proposed actions.
(B) Development in riverine areas with base flood elevations but no floodways.
(1) In riverine special flood hazard areas identified by FEMA where base flood elevation data are provided but no floodways have been designated, the cumulative effect of any proposed development, when combined with all other existing and anticipated development, shall not increase the base flood elevation more than 1.0 (one) foot at any point. Prior to issuance of a floodplain development permit, the applicant must submit a hydrologic and hydraulic analysis, conducted by a registered professional engineer, demonstrating that this standard has been met; or,
(2) Development in riverine special flood hazard areas identified by FEMA where base flood elevation data are provided but no floodways have been designated causing more than one foot increase in the base flood elevation may be permitted provided all of the following are completed by the applicant:
(a) An evaluation of alternatives which would result in an increase of one foot or less of the base flood elevation and an explanation why these alternatives are not feasible;
(b) Division (A)(2), items (a) and (c)-(e) above of this section.
(C) Alterations of a watercourse. For the purpose of these regulations, a watercourse is altered when any change occurs within its banks. The extent of the banks shall be established by a field determination of the "bankfull stage." The field determination of "bankfull stage" shall be based on methods presented in Chapter 7 of the USDA Forest Service General Technical Report RM-245, Stream Channel Reference Sites: An Illustrated Guide to Field Technique or other applicable publication available from a Federal, State, or other authoritative source. For all proposed developments that alter a watercourse, the following standards apply:
(1) The bankfull flood carrying capacity of the altered or relocated portion of the watercourse shall not be diminished. Prior to the issuance of a floodplain development permit, the applicant must submit a description of the extent to which any watercourse will be altered or relocated as a result of the proposed development, and certification by a registered professional engineer that the bankfull flood carrying capacity of the watercourse will not be diminished.
(2) Adjacent communities, the U.S. Army Corps of Engineers, and the Ohio Department of Natural Resources, Division of Water, must be notified prior to any alteration or relocation of a watercourse. Evidence of such notification must be submitted to the Federal Emergency Management Agency.
(3) The applicant shall be responsible for providing the necessary maintenance for the altered or relocated portion of said watercourse so that the flood carrying capacity will not be diminished. The Floodplain Administrator may require the permit holder to enter into an agreement with City of Montgomery specifying the maintenance responsibilities. If an agreement is required, it shall be made a condition of the floodplain development permit.
(4) The applicant shall meet the requirements to submit technical data in § 157.47(A)(1)(c) when an alteration of a watercourse results in the relocation or elimination of the special flood hazard area, including the placement of culverts.
(Ord. 5-2004, passed 5-5-04; Am. Ord. 7-2004, passed 6-2-04)
ADMINISTRATION
(A) Designation of the Floodplain Administrator. The Zoning Administrator is hereby appointed to administer and implement these regulations and is referred to herein as the Floodplain Administrator.
(B) Duties and responsibilities of the Floodplain Administrator. The duties and responsibilities of the Floodplain Administrator shall include but are not limited to:
(1) Evaluate applications for permits to develop in special flood hazard areas.
(2) Interpret floodplain boundaries and provide flood hazard and flood protection elevation information.
(3) Issue permits to develop in special flood hazard areas when the provisions of these regulations have been met, or refuse to issue the same in the event of noncompliance.
(4) Inspect buildings and lands to determine whether any violations of these regulations have been committed.
(5) Make and permanently keep all records for public inspection necessary for the administration of these regulations including Flood Insurance Rate Maps, Letters of Map Amendment and Revision, records of issuance and denial of permits to develop in special flood hazard areas, determinations of whether development is in or out of special flood hazard areas for the purpose of issuing floodplain development permits, elevation certificates, variances, and records of enforcement actions taken for violations of these regulations.
(6) Enforce the provisions of these regulations.
(7) Provide information, testimony, or other evidence as needed during variance hearings.
(8) Coordinate map maintenance activities and FEMA follow-up.
(9) Conduct substantial damage determinations to determine whether existing structures, damaged from any source and in special flood hazard areas identified by FEMA, must meet the development standards of these regulations.
(Ord. 5-2004, passed 5-5-04; Am. Ord. 7-2004, passed 6-2-04)
It shall be unlawful for any person to begin construction or other development activity including but not limited to filling; grading; construction; alteration, remodeling, or expanding any structure; or alteration of any watercourse wholly within, partially within or in contact with any identified special flood hazard area, as established in §§ 157.05, until a floodplain development permit is obtained from the Floodplain Administrator. Such floodplain development permit shall show that the proposed development activity is in conformity with the provisions of these regulations. No such permit shall be issued by the Floodplain Administrator until the requirements of these regulations have been met.
(Ord. 5-2004, passed 5-5-04; Am. Ord. 7-2004, passed 6-2-04)
An application for a floodplain development permit shall be required for all development activities located wholly within, partially within, or in contact with an identified special flood hazard area. Such application shall be made by the owner of the property or his or her authorized agent, herein referred to as the applicant, prior to the actual commencement of such construction on a form furnished for that purpose. Where it is unclear whether a development site is in a special flood hazard area, the Floodplain Administrator may require an application for a floodplain development permit to determine the development's location. Such applications shall include, but not be limited to:
(A) Site plans drawn to scale showing the nature, location, dimensions, and topography of the area in question; the location of existing or proposed structures, fill, storage of materials, drainage facilities, and the location of the foregoing.
(B) Elevation of the existing, natural ground where structures are proposed.
(C) Elevation of the lowest floor, including basement, of all proposed structures.
(D) Such other material and information as may be requested by the Floodplain Administrator to determine conformance with, and provide enforcement of these regulations.
(E) Technical analyses conducted by the appropriate design professional registered in the State of Ohio and submitted with an application for a floodplain development permit when applicable:
(1) Floodproofing certification for non-residential floodproofed structure as required in § 157.24.
(2) Certification that fully enclosed areas below the lowest floor of a structure not meeting the design requirements of § 157.23(E) are designed to automatically equalize hydrostatic flood forces.
(3) Description of any watercourse alteration or relocation that the flood carrying capacity of the watercourse will not be diminished, and maintenance assurances as required in § 157.28(C).
(4) A hydrologic and hydraulic analysis demonstrating that the cumulative effect of proposed development, when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood by more than one foot in special flood hazard areas where the Federal Emergency Management Agency has provided base flood elevations but no floodway as required by § 157.28(B).
(5) A hydrologic and hydraulic engineering analysis showing impact of any development on flood heights in an identified floodway as required by § 157.28(A).
(6) Generation of base flood elevation(s) for subdivision and large scale developments as required by § 157.22.
(F) A floodplain development permit application fee.
(Ord. 5-2004, passed 5-5-04; Am. Ord. 7-2004, passed 6-2-04)
(A) Review.
(1) After receipt of a complete application, the Floodplain Administrator shall review the application to ensure that the standards of these regulations have been met. No floodplain development permit application shall be reviewed until all information required in § 157.42 has been received by the Floodplain Administrator.
(2) The Floodplain Administrator shall review all floodplain development permit applications to assure that all necessary permits have been received from those federal, state or local governmental agencies from which prior approval is required. The applicant shall be responsible for obtaining such permits as required including permits issued by the U.S. Army Corps of Engineers under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act, and the Ohio Environmental Protection Agency under Section 401 of the Clean Water Act.
(B) Approval. Within 30 days after the receipt of a complete application, the Floodplain Administrator shall either approve or disapprove the application. If an application is approved, a floodplain development permit shall be issued. All floodplain development permits shall be conditional upon the commencement of work within one year. A floodplain development permit shall expire one year after issuance unless the permitted activity has been substantially begun and is thereafter pursued to completion.
(C) Inspections. The Floodplain Administrator shall make periodic inspections at appropriate times throughout the period of construction in order to monitor compliance with permit conditions.
(Ord. 5-2004, passed 5-5-04; Am. Ord. 7-2004, passed 6-2-04)
The following as-built certifications are required after a floodplain development permit has been issued:
(A) For new or substantially improved residential structures, or nonresidential structures that have been elevated, the applicant shall have a Federal Emergency Management Agency Elevation Certificate completed by a registered surveyor to record as-built elevation data. For elevated structures in Zone A and Zone AO areas without a base flood elevation, the elevation certificate may be completed by the property owner or owner's representative.
(B) For all development activities subject to the standards of § 157.47(A), a Letter of Map Revision.
(Ord. 5-2004, passed 5-5-04; Am. Ord. 7-2004, passed 6-2-04)