(A) All subdivision proposals shall be consistent with the need to minimize flood damage and are subject to all applicable standards in these regulations;
(B) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
(C) All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage; and
(D) In all areas of special flood hazard where base flood elevation data are not available, the applicant shall provide a hydrologic and hydraulic engineering analysis that generates base flood elevations for all subdivision proposals and other proposed developments containing at least 50 lots or 5 acres, whichever is less.
(E) The applicant shall meet the requirement to submit technical data to FEMA in § 157.47(A)(1)(d) when a hydrologic and hydraulic analysis is completed that generates base flood elevations as required by division (D) above of this section.
(Ord. 5-2004, passed 5-5-04; Am. Ord. 7-2004, passed 6-2-04)