§ 93.26 RIGHT-OF-WAY PATCHING AND RESTORATION.
   (A)   Timing. The work to be done under the excavation permit, and the patching and restoration of the right-of-way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be done because of circumstances beyond the control of the permittee or when work was prohibited as unseasonal or unreasonable under this subchapter.
   (B)   Patch and restoration. The permittee shall patch its own work. The city may choose either to have the permittee restore the right-of-way or to restore the right-of-way itself.
      (1)   City restoration. If the city restores the right-of-way, the permittee shall pay the costs thereof within 30 days of billing. If following the restoration, the pavement settles due to the permittee's improper backfilling, the permittee shall pay to the city, within 30 days of billing, all costs associated with having to correct the defective work.
      (2)   Permittee restoration. If the permittee restores the right-of-way itself, it may be required at the time of application for an excavation permit to post a construction performance bond or a deposit in accordance with the provisions of Minn. Rules part 7819.3000, as it may be amended from time to time.
   (C)   Standards. The permittee shall perform patching and restoration according to the standards and with the materials specified by the city and shall comply with Minn. Rules part 7819.1100, as it may be amended from time to time. The city shall have the authority to prescribe the manner and extent of the restoration, and may do so in written procedures of general application or on a case-by-case basis.
   (D)   Duty to correct defects. The permittee shall correct defects in patching, or restoration performed by the permittee or its agents. The permittee upon notification from the Clerk, Utilities Superintendent or other person designated by the Council, shall correct all restoration work to the extent necessary, using the method required by the Clerk, Utilities Superintendent or other person designated by the Council. The work shall be completed within five calendar days of the receipt of the notice from the Clerk, Utilities Superintendent or other person designated by the Council, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonal or unreasonable under this subchapter.
   (E)   Failure to restore. If the permittee fails to restore the right-of-way in the manner and to the condition required by the city, or fails to satisfactorily and timely complete all restoration required by the city, the city may do the work. In that event the permittee shall pay to the city, within 30 days of billing, the cost of restoring the right-of-way. If the permittee fails to pay as required, the city may exercise its rights under the construction performance bond.
   (F)   Degradation fee in lieu of restoration. In lieu of right-of-way restoration, a right-of-way user may elect to pay a degradation fee as established by the Ordinance Establishing Fees and Charges adopted pursuant to § 30.11 of this code, as that ordinance may be amended from time to time. However, the right- of-way user shall remain responsible for patching and the degradation fee shall not include the cost to accomplish these responsibilities.
§ 93.27 PERMIT LIMITATIONS.
   (A)   Limitation on area. A right-of-way permit is valid only for the area of the right-of-way specified in the permit. No permittee may do any work outside the area specified in the permit, except as provided herein. Any permittee which determines that an area greater than that specified in the permit must be obstructed or excavated must before working in that greater area make application for a permit extension and pay any additional fees required thereby, and be granted a new permit or permit extension.
   (B)   Obstruction from Small Wireless Facility Work. The city will not require an additional small wireless facility permit fee or require a new collocation agreement for routine maintenance of a small wireless facility, for replacement of a small wireless facility with a new facility that is substantially similar or smaller in size, weight, height, and wind or structural loading than the small wireless facility being replaced; or for installation, placement, maintenance, operation, or replacement of micro wireless facilities that are suspended on cables strung between existing utility poles in compliance with national safety codes. The city may require advance notification, however, of these activities if the work will obstruct the public right-of-way.
   (C)   Limitation on dates. A right-of-way permit is valid only for the dates specified in the permit. No permittee may begin its work before the permit start date or, except as provided herein, continue working after the end date. If a permittee does not finish the work by the permit end date, it must apply for a new permit for the additional time it needs, and receive the new permit or an extension of the old permit before working after the end date of the previous permit. This supplementary application must be submitted before the permit end date.
§ 93.28 TIMELINE FOR ACTION ON PERMIT APPLICATIONS.
   (A)   Denial in General. The city may deny a permit for failure to meet the requirements and conditions of this chapter or if the city determines that the denial is necessary to protect the health, safety, and welfare or when necessary to protect the right-of-way and its current use.
   (B)   Procedure for Denial on Permits other than Small Wireless Facilities Permits. The denial of a permit must be made in writing and must document the basis for the denial. The city must notify the applicant or right-of-way user in writing within three business days of the decision to deny a permit. If an application is denied, the right-of-way user may address the reasons for denial identified by the city and resubmit its application. If the application is resubmitted within 30 days of receipt of the notice of denial, no additional application fee shall be imposed. The city must approve or deny the resubmitted application within 30 days after submission.
   (C)   Procedure for Denial on Small Wireless Facilities Permits. The city shall approve or deny a small wireless facility permit application within 90 days after filing of such application, unless the collocation is on a support structure that already qualifies as an existing wireless tower or base station under Section 6409(a), codified at 47 U.S.C. 1455(a), which, in those instances, the city shall approve or deny the small wireless facility permit within 60 days. The small wireless facility permit, and any associated building permit application, shall be deemed approved if the city fails to approve or deny the application within the review periods established in this section.
   (D)   Tolling of Deadline on Small Wireless Facility Permit. The deadline for action on a small wireless facility permit application may be tolled if:
      (1)   The city receives applications from one or more applicants seeking approval of permits for more than 30 small wireless facilities within a seven-day period. In such case, the city may extend the deadline for all such applications by 30 days and shall inform the affected applicant in writing of such extension.
      (2)   The applicant fails to submit all required documents or information and the city provides written notice of incompleteness to the applicant within 30 days of receipt the application. Upon submission of additional documents or information, the city shall have ten days to notify the applicant in writing of any still-missing information.
      (3)   The city and a small wireless facility applicant agree in writing to toll the review period.
§ 93.29 INSTALLATION REQUIREMENTS.
   The excavation, backfilling, patching and restoration, and all other work performed in the right-of-way shall be done in conformance with Minn. Rules part 7819.1100, as it may be amended from time to time and other applicable local requirements, in so far as they are not inconsistent with M.S. §§ 237.162 and 237.163, as they may be amended from time to time.
§ 93.30 INSPECTION.
   (A)   Notice of completion. When the work under any permit hereunder is completed, the permittee shall furnish a completion certificate in accordance Minn. Rules part 7819.1300, as it may be amended from time to time.
   (B)   Site inspection. The permittee shall make the work-site available to city personnel and to all others as authorized by law for inspection at all reasonable times during the execution of and upon completion of the work.
   (C)   Authority of City.
      (1)   At the time of inspection, the Clerk, Utilities Superintendent or other person designated by the Council may order the immediate cessation of any work which poses a serious threat to the life, health, safety, or well-being of the public.
      (2)   The city may issue an order to the permittee for any work which does not conform to the terms of the permit or other applicable standards, conditions, or codes. The order shall state that failure to correct the violation will be cause for revocation of the permit. Within ten days after issuance of the order, the permittee shall present proof to the city that the violation has been corrected. If proof has not been presented within the required time, the city may revoke the permit pursuant to § 93.33.
§ 93.31 WORK DONE WITHOUT A PERMIT.
   (A)   Emergency situations.
      (1)   Each person with facilities in the right-of-way shall immediately notify the city of any event regarding its facilities which it considers to be an emergency. The owner of the facilities may proceed to take whatever actions are necessary to respond to the emergency. Within two business days after the occurrence of the emergency, the owner shall apply for the necessary permits, pay the fees associated therewith and fulfill the rest of the requirements necessary to bring itself into compliance with this chapter for the actions it took in response to the emergency.
      (2)   If the city becomes aware of an emergency regarding facilities, the city will attempt to contact the local representative of each facility owner affected, or potentially affected, by the emergency. In any event, the city may take whatever action it deems necessary to respond to the emergency, the cost of which shall be borne by the person whose facilities occasioned the emergency.
   (B)   Non-emergency situations. Except in an emergency, any person who, without first having obtained the necessary permit, obstructs or excavates a right-of-way must subsequently obtain a permit, and as a penalty pay double the normal fee for the permit, pay double all the other fees required by this code, deposit with the city the fees necessary to correct any damage to the right-of-way and comply with all of the requirements of this chapter.
§ 93.32 SUPPLEMENTARY NOTIFICATION.
   If the obstruction or excavation of the right-of-way begins later or ends sooner than the date given on the permit, the permittee shall notify the city of the accurate information as soon as this information is known.