749.13 FENCING AND LANDSCAPING.
   All storage tanks and other equipment remaining at the well site after drilling operations are complete shall be fenced with a locked gate within thirty days. The Planning Commission shall determine if landscaping (i. e. trees, bushes, fences, etc.) around equipment and tanks is required to provide concealment for abutting properties and surrounding properties, and a landscaping plan shall be submitted to the Commission for approval. The landscaping shall be maintained in good condition. All dead and dying landscaping shall be removed and replaced. All fences shall have a minimum height of eight feet above grade with a barbed wire top. All fence posts shall be set into concrete to a minimum depth of three feet below grade. All fence mesh shall be flush with the grade, as practical.
(Ord. 1986-6. Passed 4-28-87.)