Loading...
The following sections of Chapter 1311 shall be amended by the addition of a three percent (3%) assessment fee to be paid to the Board of Building Standards pursuant to Senate Bill 359 retroactive to July 5, 1993:
(a) Section 1311.04;
(b) Section 1311.041;
(c) Section 1311.042 - commercial and industrial electrical fee schedule.
(Ord. 66-03. Passed 5-12-03.)
Residential one, two, and three-family, condominiums or apartment houses including basements and attached garage areas measuring the outside dimensions at each floor level:
New construction, additions, renovations or alterations | $35.00 plus ten cents (10¢) per square foot of the aggregate floor area |
New garage, carport, breezeway, attached deck, porch, covered patio or structure for each enlargement to an existing dwelling or accessory building. | $35.00 |
Sheds up to 168 square feet | $25.00 |
Mobile Homes: | |
New or used replacement to be placed on an approved mobile home site | $35.00 plus seven cents (7¢) per square foot of aggregate floor area |
Swimming pools having a side wall height of thirty-six inches (36") or more: | |
Above ground | $25.00 |
In-ground | $50.00 |
Public, commercial, industrial or multi-family buildings containing four (4) or more units, including basements, cellars and sub-cellar floors, measuring the outside dimensions of the building at each floor level: | |
New construction, additions, renovations or alterations | $50.00 plus fifteen cents (15¢) per square foot of the aggregate floor area for the first 100,000 square feet, plus ten cents (10¢) per square foot for the next 100,000 square feet, plus five cents (5¢) per square foot for each additional square foot over 200,000 square feet. |
Moving permits required under Section 1315.01 | $25.00 plus ten cents (10¢) per square foot of the aggregate floor area |
Razing permits: | |
Residential | $25.00 |
Commercial | $50.00 |
Re-inspection fees | $35.00 |
Plan examination fee | $90.00 per hour or portion of an hour |
Board of Building Standards assessment | 3% added to the total cost of all commercial permits, including building, electrical, mechanical, fire alarm, fire suppression, and plan examination fees |
Nonrefundable deposit for all multi-family, commercial and industrial buildings (if a building permit is issued, this deposit will be applied toward the total cost of the permit to cover any expenses incurred in plan examination.) | $50.00 |
Any person, firm, corporation or the agent thereof who violates the requirements of permit issuance as a prerequisite to any erection, construction, alteration or repair of any structure within the corporate limits shall, upon detection, be required to purchase the necessary permit. As a penalty therefor, the violator shall pay an additional sum double the amount of the required permit fee, payable to the City Building Department.
Nothing in this chapter shall preclude the criminal prosecution for conduct which otherwise constitutes a misdemeanor under the provisions of the City’s Building Code.
(Ord. 66-03. Passed 5-12-03; Ord. 38-05. Passed 2-14-05.)
Residential one, two, and three-family new, additions or renovations | $35.00 plus ten cents (10¢) per square foot per dwelling unit |
Commercial, industrial, and multi-family with four or more units | |
new, additions or renovations | $50.00 per HVAC unit plus fifteen cents (15¢) per square foot for conditioned area |
Plans examination fee | $90.00 per hour or portion of an hour |
Replacement heating and/or air conditioning units: | |
Residential | $35.00 per unit |
Commercial | $50.00 per unit |
Fire suppression systems | $75.00 plus two cents (2¢) per square foot of protected area |
Wood burning or solid fuel stoves and fireplaces | $50.00 |
Re-inspection fees | $35.00 |
Board of Building Standards assessment | 3% added to the total cost of all commercial permits, including building, electrical, mechanical, fire alarm, fire suppression, and plan examination fees. |
(Ord. 196-01. Passed 11-12-01; Ord. 38-05. Passed 2-14-05.)
The fee for installation, alterations and remodeling of electrical wiring, rewiring, apparatus, equipment, including heating and air conditioning equipment, sanitary equipment, safety devices, controls, motors, generators, services, rectifiers, supports and accessories, including but not limited to motion picture machines, welding machines and all other electrical devices, apparatus and equipment of every type and description together with the appurtenances thereof shall be as follows:
ELECTRICAL FEE SCHEDULE
Residential - one, two and three-family | |
New construction, additions, and renovations | $35.00 plus ten cents (10¢) per square foot per unit |
Detached garages and accessory buildings | $35.00 plus five cents (5¢) per square foot |
Temporary service | $15.00 |
(Ord. 196-01. Passed 11-12-01.) | |
Replacement service entrance, water heater, range, dryer, dishwasher and air conditioner | $20.00 |
Mobile homes, sales trailers | $35.00 per unit |
Service inspection for moved house | $35.00 plus thirty cents (30¢) per outlet, switch or junction box |
Swimming Pools: | |
Above ground | $25.00 |
In ground | $35.00 |
Re-inspection fees | $35.00 |
Commercial, Industrial and Multi-family four units and up | |
New construction, additions, and renovations | $50.00 plus fifteen cents (15¢) per square foot per unit |
Parking lots | $50.00 plus $3.00 per pole or stanchion |
Signs | $35.00 plus $5.00 per circuit |
Temporary lighting | $25.00 |
Service change | $35.00 per panel |
Circuses, carnivals, tents | $35.00 |
Inspection of motors, generators, welding machines, transformers, industrial furnaces and similar apparatus shall be computed as follows: | |
Motors | |
Up to 10 H.P. | $5.00 each |
11 H.P. to 20 H.P. | $10.00 each |
21 H.P. to 50 H.P. | $15.00 each |
Over 50 H.P. | $20.00 each |
Transformers | |
1 to 10 kVA | $5.00 each |
10.5 to 25 kVA | $10.00 each |
25.5 to 50 kVA | $15.00 each |
Over 50 kVA | $20.00 each |
All other apparatus | $20.00 each |
(Ord. 66-03. Passed 5-12-03.) | |
Re-inspection fee | $35.00 |
Miscellaneous electrical | $35.00 |
Plans examination fee | $90.00 per hour or portion of an hour |
Board of Building Standards assessment | 3% added to the total cost of all commercial permits, including building, electrical, mechanical, fire alarm, fire suppression, and plan examination fees |
Permits required by these Codified Ordinances shall be applied for in writing and permits shall have been issued before work is begun. Any person, firm, or corporation found violating this section may be fined up to 100 percent (100%) of the regular permit fee in addition to the regular permit fee.
(Ord. 196-01. Passed 11-12-01; Ord. 38-05. Passed 2-14-05.)
Residential topographic review fees | $150.00 |
Residential revisions | $75.00 each |
Commercial, industrial, multi-family site plan, grading plan review | $75.00 per hour or portion of an hour |
Re-inspection fee | $35.00 |
Grading completion deposit | $850.00 |
Grading deposit shall be paid prior to the issuance of a building permit and will be refunded after as-built drawings are approved. The City may, at its discretion, use these funds to complete grading they are unable to get the developer or contractor to do to the City’s satisfaction. (Ord. 32-02. Passed 2-25-02.)
PLUMBING FEE SCHEDULE | |
Minimum Fee | $50.00 |
Residential Base Fee (includes 10 fixtures) | $150.00 |
Commercial Base Fee (includes 10 fixtures) | $300.00 |
Residential - each additional fixture | $5.00 |
Commercial - each additional fixture | $10.00 |
Water Service or Re-Piping | $50.00 |
Building Drain Line Repair | $50.00 |
Water Heater Replacement | $50.00 |
Re-Inspection Fee | $50.00 |
Residential - one, two and three-family New construction, additional and renovations | plus ten cents (10¢) per square foot per unit |
Commercial, Industrial and multi-family Four units and up New construction, additions and renovations | plus fifteen cents (15¢) per square foot per unit |
Plans Examination Fee | $90.00 per hour or portion of an hour |
(Ord. 184-14. Passed 11-10-14.)
Any person to whom a permit is issued, under the provisions of this Building Code, shall agree by the acceptance hereof to hold the City of Medina, its directors, officers or agents, harmless and free from claims of any person that may be caused by or arising from any excavation, fill, use or building construction or related operation. The permitted use or operation shall be conditional upon such agreement and liability.
(Ord. 68-58. Passed 5-4-59.)
Loading...