1311.042 ELECTRICAL FEES.
   The fee for installation, alterations and remodeling of electrical wiring, rewiring, apparatus, equipment, including heating and air conditioning equipment, sanitary equipment, safety devices, controls, motors, generators, services, rectifiers, supports and accessories, including but not limited to motion picture machines, welding machines and all other electrical devices, apparatus and equipment of every type and description together with the appurtenances thereof shall be as follows:
ELECTRICAL FEE SCHEDULE
Residential - one, two and three-family
New construction, additions, and renovations
$35.00 plus ten cents (10¢) per square foot per unit
Detached garages and accessory buildings
$35.00 plus five cents (5¢) per square foot
Temporary service
$15.00
(Ord. 196-01. Passed 11-12-01.)
Replacement service entrance, water heater, range, dryer, dishwasher and air conditioner
$20.00
Mobile homes, sales trailers
$35.00 per unit
Service inspection for moved house
$35.00 plus thirty cents (30¢) per outlet, switch or junction box
Swimming Pools:
Above ground
$25.00
In ground
$35.00
Re-inspection fees
$35.00
Commercial, Industrial and Multi-family four units and up
New construction, additions, and renovations
$50.00 plus fifteen cents (15¢) per square foot per unit
Parking lots
$50.00 plus $3.00 per pole or stanchion
Signs
$35.00 plus $5.00 per circuit
Temporary lighting
$25.00
Service change
$35.00 per panel
Circuses, carnivals, tents
$35.00
Inspection of motors, generators, welding machines, transformers, industrial furnaces and similar apparatus shall be computed as follows:
Motors
Up to 10 H.P.
$5.00 each
11 H.P. to 20 H.P.
$10.00 each
21 H.P. to 50 H.P.
$15.00 each
Over 50 H.P.
$20.00 each
Transformers
1 to 10 kVA
$5.00 each
10.5 to 25 kVA
$10.00 each
25.5 to 50 kVA
$15.00 each
Over 50 kVA
$20.00 each
All other apparatus
$20.00 each
(Ord. 66-03. Passed 5-12-03.)
Re-inspection fee
$35.00
Miscellaneous electrical
$35.00
Plans examination fee
$90.00 per hour or portion of an hour
Board of Building Standards assessment
3% added to the total cost of all commercial permits, including building, electrical, mechanical, fire alarm, fire suppression, and plan examination fees
   Permits required by these Codified Ordinances shall be applied for in writing and permits shall have been issued before work is begun. Any person, firm, or corporation found violating this section may be fined up to 100 percent (100%) of the regular permit fee in addition to the regular permit fee.