(A) Sewer connection permit. The fee required for the obtaining of a sewer connection permit as required by § 51.020 is hereby set at $500.
(B) Sewer connection fees. The fees required by § 51.022 pertaining to sewer connections are hereby set as follows:
(1) Where connection to an existing sewer main is requested, a sewer connection fee of $150 will be required.
(2) In certain cases, where a larger than normal service connection is required, a fee will be charged to the applicant based on labor and material charges involved in installing the sewer connection.
(3) All fees required by this section are due and payable in advance of the inspection or sewer connection.
(C) Private sewage disposal permit. The fee required by § 51.055 pertaining to private sewage disposal permits is hereby set at $10.
(D) Sewer use charges.
(a) Minimum charges of $18.59 per month based on the first 333 cubic feet of water usage.
(b) Residential rate - $4.014 per 100 cubic feet for everything over 333 cubic feet of water usage.
(a) Minimum charge of $27.08 per month based on the first 333 cubic feet of water usage.
(b) Commercial rate - $4.014 per 100 cubic feet for everything over 333 cubic feet of water usage.
(3) Sewage disposal at the treatment plant. All sewage transported by truck or any vehicle to the plant for disposal will be assessed a fee of $0.10 per gallon during regular business hours. Disposal during non-business hours will be assessed an additional $35 per load.
(Ord. 1662, passed 9-20-1981; Ord. 1704, passed 9-6-1983; Ord. 92-2112, passed 9-8-1992; Ord. 99-2531, passed 9-7-1999; Ord. 2003-2678, passed 9-2-2003; Ord. 2008-2813, passed 9-2-2008; Ord. 2010-2840, passed 9-20-2010; Ord. 2011-2864, passed 9-6-2011; Ord. 2016-2941, passed 10-17-2016; Ord. 2017-2958, passed 9-18-2017; Ord. 2019-2994, passed 12-2-2019; Ord. 2021-3015, passed 4-19-2021; Ord 2022-3037, passed 4-18-2022; Ord. 2023-3065, passed 4-3-2023)