§ 50.053 ELEVATION OF BUILDING SEWER.
   The building sewer shall be brought to the building at an elevation below the basement floor, except on approval of the Superintendent, overhead plumbing may be provided.
(Ord. 87-4536, passed 4-7-1987) Penalty, see § 50.999