§ 1117.01 PERMIT REQUIRED.
   No person, corporation or firm, other than an authorized employee of the city, shall construct a driveway approach connecting to a public street or right-of-way or cut, break out or remove any curb along any street or other public way without first obtaining a driveway approach/curb cut permit. Each day of violation shall constitute a separate offense. Applications for driveway approach/curb cut permits shall be made at the City Engineer’s office, according to the application procedures in § 1115.08. The City Engineer or his or her designate may require the construction plans or drawings with the permit application as he or she deems necessary to:
   (a)   Permit all reviewing authorities to make an intelligent and conclusive review of the application;
   (b)   Enable the contractor to construct the proposed facility in accordance with the terms of the permit;
   (c)   Enable the individual responsible for inspection to insure that the facility is constructed in accordance with the terms of the permit; and
   (d)   Serve as a record of the construction authorized by the permit.
(Ord. 99-207, passed 1-10-2000)