§ 931.02 COMPLIANCE WITH SPECIFICATIONS.
   Any work done in the right-of-way shall be done in accordance with the standards and requirements of the latest edition of the City of Mason Construction Standards and the State Department of Transportation, Construction and Materials Specifications, except that all cuttings shall be backfilled as specified by the City Engineer. Pavement used shall be of the same material as the surface cut. Plans for the proposed cutting shall be attached to the permit application and submitted for approval to the City Engineer.
(Ord. 99-66, passed 4-26-1999)