All ductile iron pipe shall be tested after laying. The testing shall be supervised by an authorized representative of the city. Pipe shall be tested in sections and no joint shall be covered or the trench backfilled until the pipe has been tested and approved.
(Ord. 90-61, passed 5-14-1990)