33-6-7  BACKFILL COST.
   Any person installing or replacing a culvert shall pay a fee to cover the cost of the backfill material provided by the Village as follows:
   Rock      $50.00 per section
   Dirt      $100.00 per section
   Concrete   $110.00 per yard
   Cold Patch   $100.00 per section
   If two or more culverts are connected, the fee to cover the cost of the backfill material per section is the same as provided above.
   A “section” of culvert, for purposes of this Section, shall be defined as any culvert up to twenty (20) feet in length. 
(Ord. No. 2016-04; 02-01-16)