1224.01 PURPOSE AND SCOPE.
   (a)   The purpose of this regulation is to establish technically feasible and economically reasonable storm water management standards to achieve a level of storm water quality and quantity control that will minimize damage to property and degradation of water resources and will promote and maintain the health, safety, and welfare of the residents of the City of Maple Heights.
   (b)   This regulation requires owners who develop or re-develop their property within the City of Maple Heights to:
      (1)   Control storm water runoff from their property and ensure that all storm water management practices are properly designed, constructed, and maintained.
      (2)   Reduce water quality impacts to receiving water resources that may be caused by new development or redevelopment activities.
      (3)   Control the volume, rate, and quality of storm water runoff originating from their property so that surface water and ground water are protected and flooding and erosion potential are not increased.
      (4)   Minimize the need to construct, repair, and replace subsurface storm drain systems.
      (5)   Preserve natural infiltration and ground water recharge, and maintain subsurface flow that replenishes water resources, except in slippage prone soils.
      (6)   Incorporate storm water quality and quantity controls into site planning and design at the earliest possible stage in the development process.
      (7)   Reduce the expense of remedial projects needed to address problems caused by inadequate storm water management.
      (8)   Maximize use of storm water management practices that serve multiple purposes, including but not limited to flood control, erosion control, water quality protection, recreation, and habitat preservation.
      (9)   Design sites to minimize the number of stream crossings and the width of associated disturbance in order to minimize the City of Maple Heights future expenses related to the maintenance and repair of stream crossings.
      (10)   Maintain, promote, and re-establish conditions necessary for naturally occurring stream processes that assimilate pollutants, attenuate flood flows, and provide a healthy water resource.
   (c)   This regulation shall apply to all parcels used or being developed, either wholly or partially, for new or relocated projects involving highways and roads; subdivisions or larger common plans of development; industrial, commercial, institutional, or residential projects; building activities on farms; redevelopment activities; grading; and all other uses that are not specifically exempted in Section 1224.01.
   (d)   Public entities, including the State of Ohio, Cuyahoga County, and the City of Maple Heights shall comply with this regulation for roadway projects initiated after March 10, 2006 and, to the maximum extent practicable, for projects initiated before that time.
   (e)   This regulation does not apply to activities regulated by, and in compliance with, the Ohio Agricultural Sediment Pollution Abatement Rules.
   (f)   This regulation does not require a Comprehensive Storm Water Management Plan for linear construction projects, such as pipeline or utility line installation, that do not result in the installation of impervious surface as determined by the City Engineer. Such projects must be designed to minimize the number of stream crossings and the width of disturbance. Linear construction projects must comply with the requirements of Chapter 1225, Erosion and Sediment Control.
   (g)   This regulation does not apply to construction or re-construction of stand-alone single-family dwellings when the parcel is not part of an overall subdivision or is part of a subdivision that is in existence as of the adoption of this chapter, unless otherwise required by the City Engineer.
(Ord. 2008-128. Passed 12-17-08.)