1505.04 PERMIT REQUIRED.
   A permit shall be required and the twenty-five dollar ($25.00) fee paid for each facility at which aboveground flammable liquid storage is maintained. Plans shall be submitted at the time of application for the permit.
(Ord. 92-012. Passed 1-21-92.)