1020.06  CONSTRUCTION STANDARDS.
   Excavating, laying, construction, form work, jointing and finishing of all curbs, sidewalks, driveways and gutters shall be according to the best practice and methods and in every case such as will meet with the approval of the Township Engineer.  Every provision separately noted for curbs, sidewalks, driveways and gutters, and applying under each or another classification, shall be with as full force and effect as if set out at length in each such classification of curbs, sidewalks, driveways and gutters. Any materials, practices and methods to be employed in these classifications and not now contemplated in these specifications may be put into effect or regulated by the Township Engineer.
(Ord. 186.  Passed 5-24-35.)