926.23 AS-BUILT PLANS.
   All applicants are required to submit actual "as-built" plans, including a certification and a Survey, for any storm water management practices located on-site after final construction is completed. The plan must show the final design specifications for all storm water management facilities and must be sealed, signed, and dated by a Professional Engineer and a Professional Land Surveyor. The engineer's certification shall certify that the facilities have been constructed in accordance with the approved plans. The surveyor shall complete a field survey of the storm water facilities to verify as-built elevations and dimensions.
(Ord. 2022-31. Passed 4-12-22.)