Utilities, including, but not necessarily limited to, gas, water, sewage, overhead electric power, telephone, and cable TV facilities, shall be provided in the street right of way in the grass plot area, except that underground residential electrical systems may be on private rights of way. When desirable, utilities may be installed in rear lot easements.
Before any pavement base is applied, all grading must be completed and approved by the Planning Commission's authorized representative, and all of the in-street underground work, such as water mains, gas mains, etc., and all service connections, shall be completely installed and approved by the authorized representative throughout the length of the street and across the flat section. The subdivider shall install all laterals to the lot line prior to construction of the street.
(Ord. 1433. Passed 2-2-76; Ord. 75-96. Passed 11-18-96.)