Skip to code content (skip section selection)
Compare to:
SEC. 91.9509. INFORMATION REQUIRED ON PLANS.
 
91.9509.1. General. For existing and new construction, the plans and specifications shall be of sufficient clarity to indicate the nature and extent of the proposed work and to show in detail that it will conform to the provisions of this division and the Los Angeles Building Code.
 
91.9509.2. Engineer's or Architect's Statement. (Amended by Ord. No. 185,587, Eff. 7/16/18.) The responsible engineer or architect shall provide the following statements on the approved plans:
 
   1.   "I am responsible for designing this building's seismic strengthening in compliance with the minimum standards of Division 95, Article 1 of the LAMC using the design criteria of 75% of ASCE 7 or ASCE 41."
 
   and when applicable:
 
   2.   "The Registered Deputy Inspector, required as a condition of the use of structural design stresses requiring continuous inspection, will be responsible to me as required by LAMC Section 91.1704."
 
   3.   "Structural Observation will be performed in accordance with the current Los Angeles Building Code."