(a) Every person owning, using, controlling or having an interest in pipes, conduits, ducts or other structures under the surface of any street used for the purpose of supplying or conveying gas, electricity, communication impulses, water or steam to or from the Village or to or from its inhabitants, or for any other purposes, shall file with the Director, within 120 days after the adoption of these Codified Ordinances provisions, a map or set of maps, each drawn to a scale of not less than one (1) inch to 200 feet, showing the location, size and description of all such installations.
(b) Within thirty days after January 1 of each and every year, such person shall file with the Director a corrected map or set of maps, each drawn to scale as above, showing such installations, including all those made during the previous year. However, if no additions have been made to its installation during the previous year, a utility may file with the Director a written statement to that effect, within the period of time specified above. A utility may at its own option elect to provide corrected maps throughout the year as they are available rather than proceed as above noted.
(c) Each map herein required shall be accompanied by an affidavit, endorsed thereon, to the effect that the same correctly exhibits the details required to be shown by this section.
(Ord. 2020-10. Passed 9-3-20.)