(A) For the purpose of this section, the following definitions shall apply unless the context clearly indicates or requires a different meaning.
APPROVED MATERIAL. Clean sand or pea gravel to contain no more than 10% dirt by volume.
PROPER AUTHORITIES. The Board of Public Works and Safety.
(B) All cuts in paved streets must be filled with approved fill as before stated and topped out with four inches of concrete and two inches of hot-mix blacktop or six inches of concrete in cement streets.
(Prior Code, § 23-61) (Ord. passed 6-10-1957; Ord. 80-14, passed 8-25-1980)