FEE SCHEDULE
SUBJECT | FEES |
SUBJECT | FEES |
CODE OF ORDINANCES BOOK [Res. 1/7/2013] | $30 |
COMMERCIAL BUILDINGS | $2 per $1,000 |
LAND USE PERMITS | $40 |
House or Mobile Home | $70 |
Addition to Structure | $50 |
Shed or garage greater than 100 sq. feet) [Ord. 2-2016-1, 2/1/2016] | $35 |
Warehouse (less than 1,500 sq. feet) | $40 |
Swimming pools | $35 |
Home occupation with signage allowance | $50 |
Barn and other nonresidential structures larger than 1,500 sq. feet | $80 |
CONDITIONAL USE | |
Permit applications (nonrefundable) | $300 |
[Res. 11-12B-2007] | |
$500 filing fee | |
Continuances [Res. 2/1/2010] | $300 per continuance |
DRIVEWAY PERMITS | |
Road attachments | $60 |
[Res. 1/7/2013] | |
FAXED COPIES [Res. 1/7/2013] | $0.50 per sheet |
PHOTOCOPIES [Res. 1/7/2013] | $0.25 per sheet |
RENT OF BUILDING [Res. 1/7/2013] | $50 nonrefundable |
PARK RENTAL [Res. 02-2020] | $20 per pavilion |
SEWAGE PERMITS [Res. 2/1/2010] (Refer to the Sewage Enforcement Officer Services fee schedule attached to Res. 02-2020.) | |
SEWAGE ENFORCEMENT OFFICERS 2022 RATE SCHEDULE | |
APPLICATIONS
| |
On-lot systems (approved or denied): 1 perc. included | $575 |
On-lot systems (approved or denied) | $325 |
Additional percolation test (per set) | $275 |
Minor repairs to existing system | $250 |
Septic tank replacement | $250 |
Holding tank/privy/composting toilet | $375 |
Transfer permit | $120 |
Chemical/composting toilet | $120 |
Commercial holding tank | $950 |
System inspection | $130 |
Spray or drip irrigation | time and material costs |
Small flow treatment facility inspections will be billed on a time and material basis with the minimum charge being $150. The municipality will bill the owners of the SFTF for the inspection fee. | |
MUNICIPAL CONSULTATION/ENFORCEMENT: | |
Primary Sewage Enforcement Officer | $50 per hour |
Alternate Sewage Enforcement Officer | $50 per hour |
Secretarial administration | $34 per hour |
Mileage rate | $0.55 per mile |
Preparation of percolation test holes (digging set of 6) | $120 |
Supply water per set of six percolation holes | $120 |
Conduct pre-soak per set of six percolation holes | $60 |
LAND DEVELOPMENT: | |
Site evaluation & soil test pit observation (4 per lot) (hourly rate over 4) | $200 per lot |
Percolation tests (primary or replacement site) | $225 |
Planning module reviews and re-reviews | At hourly rate |
Preparation of percolation test holes (digging set of 6) | $120 |
Supply water per set of six percolation holes | $120 |
Conduct pre-soak per set of six percolation holes | $60 |
NON-RESIDENTIAL: | |
The application fees for all non-residential land development will be based on the proposed sewage flow on an Equivalent Dwelling Unit (EDU) of 400 per gallon per day equals one lot. | |
ON-LOT SEWAGE DISPOSAL SYSTEM DESIGNS AND PLANNING MODULE ASSISTANCE: | |
On-lot sewage disposal system designs and sewage planning module assistance will be completed at an hourly rate plus cost of copies, postage and mileage @ the prevailing hourly rate for the Primary Sewage Enforcement Officer. | |
Land Surveying services will be billed at a rate and will be charged directly to the client, all fees payable to the Township. | $50 per hour |
[Res. 3/1/2010; as amended by Ord. 2018] | |
SOLID WASTE | |
application fee | $100 |
SUBDIVISION AND LAND DEVELOPMENT | |
Township Fees | |
Plan Processing Fees: | |
The following fees shall be paid to Lamar Township at the time of plan submission or filing for evaluation and processing of proposed subdivision or land development plans. No plans shall be considered filed until the appropriate processing fee is received. No fees shall be refundable. | |
Sketch Plans: There shall be no charge for the evaluation of sketch plan submission. | |
Preliminary Plans: The fee for processing of all preliminary subdivision or land development plans shall be: | |
Subdivisions | |
2 lots | $100 |
3 lots | $110 |
4 lots | $120 |
5 lots | $130 |
Over 5 lots | $150 plus $10 for each lot |
Land Development | |
Residential Development | $150 per plan plus $10 for each dwelling unit shown on the plans. |
Non-Residential Developments | $150 per plan plus $10 for each 1,000 sq. ft. of gross floor area, or portion thereof, up to a maximum of $1,000. |
Preliminary/Final Plans: When Preliminary/Final plans are submitted together, fee shall be same as Preliminary | |
Final Plans: There shall be charge for final plans | |
Improvement Design Review Fees: | |
The applicant shall reimburse Lamar Township for all reasonable and necessary charges by the Township Engineer and/or consultant for review of site improvement or development designs and report thereon to the Township of Lamar in accordance with the procedure set forth in § 22-207 of the Lamar Township Subdivision and Land Development Ordinance. | |
Improvement Inspection Fees: | |
Where improvements are required by Lamar Township to be installed as a condition of final approval of a subdivision or land development plan, said improvements must be inspected by the Township Engineer in accordance with the procedure established in § 22-207 of the Lamar Township Subdivision and Land Development Ordinance upon their completion. | |
The applicant shall reimburse Lamar Township for all reasonable and necessary expenses associated with the inspection of the infrastructure improvements by the Township Engineer. | |
County Plan Review Fees | |
The applicant shall be responsible for assuming all costs associated with the review of his/her subdivision or land development plans by the Clinton County Planning Commission, according to the fee schedule and procedure established by the Clinton County Planning Commissioners. | |
VARIANCES | |
$500 filing fee | |
Continuances | $300 per continuance |
[Res. 2/1/2010] | |
ZONING/LAND USE PERMIT [Res. 2/1/2010] | $40 |
(Res. 12/10/2001; as amended by Res. 02-2005, 10/10/2005; by Res. 11-12B-2007, 11/12/2007; by Res. 1-7-2008; by Res. 2/1/2010; by Res. 3/1/2010; by Res. 1/7/2013; by Ord. 2-2016-1, 2/1/2016; by Ord. 2018; and by Res. 02-2020, 5/12/2020)
Notes
1 | Any fee exceeding the variance and conditional use hearing fees will be reimbursed to the applicant upon the decision. |
2 | Any fee exceeding the variance and conditional use hearing fees will be reimbursed to the applicant upon the decision. |