(A) Better Site Design. Whenever possible, Development projects shall be designed using the Better Site Design Techniques of the current version of the Minnesota Stormwater Manual1.
(B) MIDS calculator. Final site design and choice of permanent Stormwater volume reduction practices shall be based on outcomes of the MIDS Calculator (or other model that shows the performance goal can be met) and shall meet the performance goals in section 6 of this subchapter.
(C) Buffer requirement. Buffer locations and widths must comply with the State of Minnesota, Minnesota Pollution Control Agency, and Middle St. Croix Watershed Management Organization or Valley Branch Watershed District standards. Available at http://Stormwater.pca.state.mn.us/index.php/Better_site_design.