Loading...
Drainage pipes and other material on the right-of-way at the time of street construction which were purchased by the property owner will be removed and placed on the lot of the owner for his disposition. The town will haul away such items if requested by the owner and with the owner's permission.
(`88 Code, § 18-88)
(A) All street grading, base course preparation, storm drainage, surfacing, curb and gutters and other improvements shall be constructed in accordance with the written specifications of the town which have been approved by the Board of Commissioners.
(B) All work shall be done under the supervision of the Public Safety Director or designee.
(`88 Code, § 18-89)
Improvements will be considered on a priority need basis, with the cost shared 50% by the property owners and 50% by the town. All petitions shall include the street, length of paving required and agreement to pay 50% of such property owners' share of the cost in advance.
(`88 Code, § 18-91)