§ 91.51 INSTALLATION OF WATER AND SEWER FACILITIES.
   The Board of Commissioners, prior to approving any project or authorizing any street improvement, shall determine if water and sanitary sewer facilities have been installed within that portion of the street located between curbs. If such facilities have not been installed or if facilities are inadequate and will have to be replaced, the Board of Commissioners shall postpone the street improvement project pending the installation of such facilities.
(`88 Code, § 18-87)
§ 91.52 DISPOSITION OF DISPLACED MATERIAL.
   Drainage pipes and other material on the right-of-way at the time of street construction which were purchased by the property owner will be removed and placed on the lot of the owner for his disposition. The town will haul away such items if requested by the owner and with the owner's permission.
(`88 Code, § 18-88)
§ 91.53 STANDARDS OF CONSTRUCTION; SUPERVISION OF WORK.
   (A)   All street grading, base course preparation, storm drainage, surfacing, curb and gutters and other improvements shall be constructed in accordance with the written specifications of the town which have been approved by the Board of Commissioners.
   (B)   All work shall be done under the supervision of the Public Safety Director or designee.
(`88 Code, § 18-89)
§ 91.54 RESURFACING.
   Whenever it is necessary to resurface any street which has been surfaced under the provisions of this subchapter, the town shall undertake such resurfacing when funds are appropriated and the town shall bear the entire cost of such work.
(`88 Code, § 18-90)
§ 91.55 PRIORITY CONSIDERATION; SHARE OF COSTS.
   Improvements will be considered on a priority need basis, with the cost shared 50% by the property owners and 50% by the town. All petitions shall include the street, length of paving required and agreement to pay 50% of such property owners' share of the cost in advance.
(`88 Code, § 18-91)