1422.01 2015 EDITION ADOPTED; FILE AND DISTRIBUTION COPIES.
   (a)   There is hereby adopted by the City, in its entirety, but for the specific exemptions as identified and detailed below, for the purpose of establishing standards and specifications for the installation and repair of plumbing, plumbing fixtures and plumbing systems, that certain code known as the International Plumbing Code, 2015 Edition, as published by the International Code Council, Inc. save and except such provision as are hereinafter deleted or amended.
   Chapter 3 Section 312 Tests and Inspections
   IPC 312.3 Drainage and vent air test - An air test shall be made by forcing air into the system until there is a uniform gauge pressure of 5 psi (34.5 kPa) or sufficient to balance a 10-inch (254 mm) column of mercury. This pressure shall be held for a test period of not less than 15 minutes. Any adjustments to the test pressure required because of changes in ambient temperatures or the seating of gaskets shall be made prior to the beginning of the test.
   Chapter 7 Section 702 Materials
   IPC 702.2 Underground building sanitary drainage and vent pipe. - Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2.
MATERIAL
STANDARD
MATERIAL
STANDARD
Acrylonitrile butadiene styrene (ABS) plastic pipe in IPS Diameters, including Schedule 40, DR 22 (PS 200) and DR 24 (PS 140); with a solid, cellular ccore or composite wall
ASTM D 2261; ASTM F 628; ASTM F 1488; CSA B181.1
Cast-iron pipe
ASTM A 74; ASTM A 888; CISPI 301
Copper or copper-alloy tubing (Type K, L, M or DWV)
ASTM B 75; ASTM B 88; ASTM B 251; ASTM B 306
Polyolefin pipe
ASTM F 1412; CSA B181.3
Polyvinyl chloride (PVC) plastic pipe in IPS diameters, including Schedule 40, DR 22 (PS 200) and DR 24 (PS 140); with a solid, cellular core or composite wall
ASTM D 2665; ASTM F 891; ASTM F 1488; CSA B181.2
Polyvinyl chloride (PVC) plastic pipe with a 3.25-inch O.D. and a solid, cellular core or composite wall
ASTM D 2949, ASTM F 1488
Polyvinylidene fluoride (PVDF) plastic pipe
ASTM F 1673; CSA B181.3
Stainless steel drainage systems, Type 316L
ASME A 112.3.1
Polyethylene (PE) plastic pipe (SDR-PR)
ASTM F 714
Polvester Fiber (CIPP)
ASTM D 5813, ASTM F 1216, ASTM F 1743
Folded/Formed Poly (Vinyl Chloride)
ASTM 1871, ASTM F 1504, ASTM F 1947
 
   SECTION 717
   REPLACEMENT or Repair OF UNDERGROUND SEWERS BY PIPE-BURSTING, PIPE SPLITTING, SLIP LINING, FOLD AND FORM LINING OR OTHER TRENCHLESS METHODS
   717.1 General.
   This section shall govern the replacement or repair of existing building sewer piping by pipe-bursting, pipe splitting, slip lining, fold and form lining or other trenchless methods. (TRENCHLESS METHOD)
   717.2 Applicability.
   The replacement of building sewer piping by trenchless methods shall be limited to gravity drainage piping.
   717.3 Pre-installation inspection.
   The existing piping sections to be replaced shall be inspected internally by a recorded video camera survey. The survey shall include notations of the position of cleanouts and the depth of connections to the existing piping. The inspection shall determine and confirm if the piping is such that trenchless methods are a feasible application.
   717.4 Pipe.
   The replacement piping shall meet material specifications of TABLE 702.2.
   717.5 Pipe fittings.
   Pipe fittings to be connected to the replacement piping shall be compatible with pipe installed and existing pipe.
   717.6 Cleanouts.
   Where the existing building sewer did not have cleanouts meeting the requirements of this code, clean-out fittings shall be installed as required by this code.
   717.7 Post-installation inspection.
   The completed replacement piping section shall be inspected internally by a recorded video camera survey. The video survey shall be reviewed and approved by the code official prior to pressure testing of the replacement piping system.
   717.8 Pressure testing.
   The replacement piping system as well as the connections to the replacement piping shall be tested in accordance with Section 312.
   (b)   Not less than three copies of such Code are on file with the Assistant City Manager, and the Assistant City Manager shall keep the same with the ordinance book of the City and make the same available for public use, inspection and examination.
(Ord. 4397. Passed 9-10-86; Ord. 4805. Passed 8-19-98; Ord. 4970. Passed 10-12-05; Ord. 5290. Passed 6-10-20.)