(a) Prior to framing any structure, a sealed, as-built foundation survey certification is required from a registered surveyor. Two sealed copies of the survey are required to be submitted to the zoning inspector for review and approval before proceeding with construction. Any structure requiring a foundation in the SR-1, SR-2, UR-1, UR-2, AR-1, GCC-1, GCC-2, LM, FP, OS, and VC is required to have a foundation survey.
(b) The following definitions shall apply to this section:
(1) “Foundation” means the lowest load-bearing part of a building, typically below ground level.
(2) “Structure” means anything constructed or erected, the use of such requires location on the ground or attachment to something having a fixed location on the ground. (Ord. 02-2016. Passed 2-16-16.)