9-4-25: APPENDIX A, ILLUSTRATIONS AND EXHIBITS (IDPH SECTION 905):
 
ILLUSTRATION A
QUANTITY OF SEWAGE FLOWS
Type Of Establishment
Unit (Per)
Gallons Per Day
Type Of Establishment
Unit (Per)
Gallons Per Day
Permanent residential dwellings:
 
 
 
Single-family
Bedroom
200
 
Multi-family
Bedroom
200
 
Individual mobile homes
Bedroom
200
 
Mobile home parks
Space
400
 
Boarding houses
Person
50
 
Rooming houses
Resident
40
Institutions:
 
 
 
Hospitals, medical
Bed
250
 
Hospitals, medical
Employee
15
 
Hospitals, mental
Bed
150
 
Hospitals, mental
Employee
15
 
Long term care institutions
Bed
125
 
Long term care institutions
Employee
15
 
Prison
Inmate
150
 
Prison
Employee
15
Schools:
 
 
 
Boarding school
Person
150
 
Schools without cafeteria or showers
Person
15
 
Schools with cafeteria and showers
Person
25
 
Schools with cafeteria or showers
Person
20
Travel:
 
 
 
Airports
Passenger
5
 
Railway stations
Passenger
5
 
Bus stations
Passenger
5
 
Highway rest areas
Traveler
5
Recreational and seasonal areas:
 
 
 
Campgrounds with mobile homes
Site
150
 
Swimming pools and bathing beaches
Person
10
 
Comfort station with toilets and showers
Space
35
 
Comfort station without showers
Space
25
 
Day camps without meals
Person
25
 
Day camps with meals
Person
35
 
RV parks with water and sewer hookups
Space
50
 
Cottages and/or small dwellings with seasonal occupancy
Bedroom
150
 
Picnic parks with toilet facilities only
Person
10
 
Youth camps without cafeteria
Person
50
 
Youth camps with cafeteria
Person
60
 
Migrant labor camps
Person
150
 
Sanitary dump station for unsewered site
Site
20
 
Campground with central bath and toilet facilities
Person
35
Commercial, industrial and miscellaneous:
 
 
 
Country clubs, no kitchen
Member
25
 
Hotels and motels
Bed
50
 
Places for public assembly
Person
5
 
Theaters
Seat
5
 
Churches without kitchen
Seat
3
 
Churches with kitchen
Seat
6
 
Restaurants
Meal
10
 
Restaurants with bar and cocktail
Meal
12
 
Offices and day workers
Person
15
 
Shopping centers
(Per 1,000 sq. ft. of floor area)
250
 
Stores
Toilet
400
 
Service stations (served)
Vehicle
10
 
Laundries
Customer
50
 
Construction camps or sites, factories with toilets and showers
Person
35
 
Factories with toilets, no showers
Person
20
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION C
LIST OF APPROVED PLASTIC PIPE FOR PRIVATE SEWAGE DISPOSAL SYSTEM
X - Indicates approved use
Types Of Pipes
ASTM Standard 3
Building Sewer1 Or Common Collector
Sewer Lines1
All Subsurface Seepage Systems
Types Of Pipes
ASTM Standard 3
Building Sewer1 Or Common Collector
Sewer Lines1
All Subsurface Seepage Systems
 
 
5' from building to septic aeration tank to 5' beyond the septic tank, aeration tank or distribution box
Additional treatment facilities and sand filter distribution lines and collection lines
 
ABS (DWV schedule 40)
F628-06
X
X
X
ABS (DWV schedule 40)
D2661-06
X
X
X
ABS
D1527-99 (2005)
X
X
X
ABS (sewer pipe)
D2751-05
X2
X2
X2
PVC
D1785-06
X
X
X
PVC (DWV schedule 40)
D2665-07
X
X
X
PVC (DWV schedule 40)
F891-04
X
X
X
PVC (type PSM) (SDR 35)
D3034-06
X2
X2
X2
PVC (sewer and drain PS-50)
F891-04
X
X
X
PVC (sewer and drain PS-25)
F891-04
X
X
 
PVC (corrugated-smooth wall)
F949-06
X
X
 
PVC (std. or perforated)
D2729-03
 
X
X
PE (smooth wall)
R810-07
AASHTO standard M252-06
 
X
X
PE (corrugated-perforated)
F405-05 (heavy duty only)
 
 
X
PE (corrugated-perforated)
F667-06
 
 
X
 
Notes:
    1.    Plastic materials shall not be commingled within this area except through the use of proper adapters. (See Illinois plumbing code.) When the building sewer is of a type of material that is different from the building drain, proper transition fittings shall be used.
    2.    Pipe shall be SDR (standard dimension ratio) 35 only.
    3.    The last 2 numbers of the ASTM standard indicate the date of the edition.
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013) (Ord. 15-961, 4-14-2015)
ILLUSTRATION D
LOCATION OF COMPONENTS OF PRIVATE SEWAGE DISPOSAL SYSTEMS
Component Part Of System
Minimum Distance Allowable From 1,2
Cistern Well, Or Suction Line From Pump To Well
Water Supply Line3 Pressure
Lake, Stream, Inground Swimming Pool Or Other Body Of Water
Property Dwelling
Property Line4
Artificial Drain
Component Part Of System
Minimum Distance Allowable From 1,2
Cistern Well, Or Suction Line From Pump To Well
Water Supply Line3 Pressure
Lake, Stream, Inground Swimming Pool Or Other Body Of Water
Property Dwelling
Property Line4
Artificial Drain
Building sewer5
50'
10'
25'
-
-
-
Septic tank or aerobic treatment plant
50'
10' 9
25'
5'
5'
-
Distribution box
75'
10'
25'
10'
5'
-
Subsurface seepage system
75'
25'
25'
10'
5'
10'
Sand filter
75'
25'
15'
10'
5'
10'
Privy
75'
25'
25'
20'
5'
10'
Waste stabilization pond
75'
25'
25'
20'
5'
10'
Surface discharge effluent line
50'
10'
-
-
5'
-
Effluent receiving trench
75'
25'
15'
10'
5'
10'
Treated effluent discharge point6
50'
10'
-
20'
25'
25'
Class V injection wells7
200' 8
25'
25'
10'
5'
10'
 
Notes:
   1.    These distances have been determined for use in clay, silt and loam soils only. The minimum distances required for use in sand or other types of soil shall be determined for the proposed private sewage disposal system and approved by the department. Approval will be given if the department determines that the soil will provide treatment of the sewage.
   2.    For separation distances to closed loop wells, see 77 Illinois administrative code 920.180.
   3.    See section 905.20(d) for additional details on water line and sewer separation.
   4.    If a common property is used, the boundary of the common property shall be used.
   5.    The building sewer or surface discharge effluent line may be located to within 10 feet of a well or suction line from the pump to the well when cast iron pipe with mechanical joints or schedule 40 PVC pipe with watertight joints is used for the building sewer or surface discharge effluent line.
   6.    Any surface discharging system installed, repaired or renovated after January 1, 2014.
   7.    Class V injection wells are defined in Illinois pollution control board rules. They are typically a shallow well used to place fluids directly below the land surface. See, e.g., 35 Illinois administrative code 704.105, 704.106 and 704.280.
   8.    A lesser separation distance may be obtained with approval or a waiver from IEPA.
   9.    There shall be 25 feet separation from public water supply, water mains and water service lines. The terms public water supply, water main and water service line shall have the same meaning as in the Illinois pollution control board's public water supplies rules. See, e.g., 35 Illinois administrative code 653.118 and 653.119.
   10.    A 10 foot minimum separation is required from any septic component to a drain tile, open ditch, swale, driveway, fence or deck.
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013) (Ord. 15-961, 4-14-2015; amd. Ord. 2015-966, 12-8-2015)
ILLUSTRATION E
SEPTIC TANKS
   Exhibit A: Septic Tank With Slip-In Baffles
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Septic Tank With T-Baffles
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit C: Typical Gas Deflection Devices
 
(Source: Added at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION F
MINIMUM VOLUMES FOR SEPTIC TANKS SERVING RESIDENTIAL UNITS
 
Number Of Bedrooms
Minimum Liquid Capacity Of Tank (Gallons)
Minimum Liquid Capacity Of Tank (Gallons) When Garbage Grinder Is Used
2 or less
750
1,125
3
1,000
1,500
4
1,250
2,000
5
1,500
2,200
6
1,750
2,600
7
2,000
3,000
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION G
INSTRUCTIONS FOR CONDUCTING PERCOLATION TESTS
Percolation tests shall not be made in frozen ground or ground that has been filled in the preceding 12 months. Percolation tests shall be performed in accordance with the following procedures:
      1.   Number And Location Of Percolation Tests: Select an area where the seepage field will be located. When digging the holes, avoid animal burrows, large root channels, etc. At least 3 separate percolation tests shall be performed at the site of each proposed disposal area. The percolation test holes shall be at least 50 feet apart. At least one hole shall be located at the lowest elevation of the proposed absorption field area. The 2 holes with the highest results shall be used to determine percolation rate.
      2.   Depth Of Percolation Test Hole: Dig or bore the holes with horizontal dimensions approximately 4 to 6 inches in diameter to the depth of the proposed seepage field or seepage bed.
      3.   Preparation Of Test Hole:
         a) Carefully pick the bottom and sides of the hole with a knife blade or sharp pointed instrument to remove smeared or smoothed soil and to provide a natural soil interface into which water may percolate.
         b) Remove all loose material from the hole.
         c) Add 2 inches of coarse gravel to protect the bottom from scouring and sediment. A removable hardware cloth screen to line the lower part of the hole also helps prevent sloughing of the hole sides during testing.
      4.   Saturation And Swelling Of Soil: It is important to distinguish between saturation and swelling. Saturation means the void spaces between soil particles are full of water. This can be accomplished in a very short period of time. Swelling is caused by the intrusion of water into the individual soil particle. This is a slow process, especially in a clay type soil and is the reason for requiring a prolonged soaking period.
         a) On the day prior to conducting the percolation test, carefully fill the hole with water and keep it full for at least 4 hours. The percolation test shall be conducted on the day following this presoaking at least 18 hours after presoaking is completed but prior to 30 hours after presoaking is completed. Cover the hole during this 18 - 30 hour waiting period. In sandy soils with greater than 70% sand and less than 15% clay (sand and loamy sand), after the 4 hour presoak, a percolation test may be attempted without the 18 hour waiting period. If the percolation test results are greater than 45 minutes for a 6 inch drop in water, the test must be repeated after the 18 hour waiting period. If the percolation test results are 45 minutes or less, the percolation rate shall be used to size the system.
         b) On the day of conducting the percolation test, carefully fill the hole with water to 12 inches above the gravel.
         c) Allow the water level to drop to a point 6 inches above the gravel. If the water does not fall from 12 inches to 6 inches in 6 hours, the percolation test is terminated and an alternate system is required.
         d) Measure the last 6 inch drop in water level at thirty minute intervals until all the water has seeped away. Warning: Under no conditions shall measurements be taken from water filled to the top of the hole or on water 12 inches deep in the hole. Such results are completely invalid and will not be accepted. Results from the last 6 inches of drop in water are the only results that will be accepted.
      5.   Recording Of Results: Record results of all tests as the total minutes required for the last 6 inches of seepage. If the last 6 inches of water has not seeped away at the end of 6 hours, the soil must be considered unsuitable for seepage field disposal and the appropriate statement marked on the results form. If there is more than a 30 minute difference between the highest 2 percolation tests, use the larger result or perform additional percolation tests.
      6.   Calculating The Percolation Rate: Add the total minutes required for the last 6 inches of water to fall from the 2 holes with the highest result and divide by 2. If the average is less than 60 minutes, use the percolation rate of 60 minutes. If the average is greater than 60 minutes, refer to illustration H of this appendix. Locate in the first column (time (minutes) required for last 6 inches of water to fall) where the highest 2 hole average fits and use the next highest result as the percolation rate for sizing and design. An example of this procedure is as follows: If 3 percolation tests are conducted with results of 120 minutes, 140 minutes, and 155 minutes, the highest 2 hole average would be (140 + 155)/2 or 147.5 minutes. Looking at illustration H of this appendix, the next highest result would be 150 minutes. The 150 minute rate would be used to size and design the subsurface seepage system.
      7.   Distribution Of Results: The results of the percolation tests shall be given to the homeowner and shall be retained by the contractor for at least 5 years. The percolation test data report shall be returned to the appropriate regional office or local authority.
 
Test Hole:
Test Hole #1
Test Hole #2
Test Hole #3
Reading #
Time
(In Min.)
Water
Level
(In Inches)
Time
(In Min.)
Water
Level
(In Inches)
Time
(In Min.)
Water
Level
(In Inches)
Test Hole:
Test Hole #1
Test Hole #2
Test Hole #3
Reading #
Time
(In Min.)
Water
Level
(In Inches)
Time
(In Min.)
Water
Level
(In Inches)
Time
(In Min.)
Water
Level
(In Inches)
1
0
 
0
 
0
 
2
30
 
30
 
30
 
3
60
 
60
 
60
 
4
90
 
90
 
90
 
5
120
 
120
 
120
 
6
150
 
150
 
150
 
7
180
 
180
 
180
 
8
210
 
210
 
210
 
9
240
 
240
 
240
 
10
270
 
270
 
270
 
11
300
 
300
 
300
 
12
330
 
330
 
330
 
13
360
 
360
 
360
 
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
 ILLUSTRATION H
SUBSURFACE SEEPAGE SYSTEM SIZE DETERMINATION
Exhibit A: Gravel System1,2,3,4
Time (Minutes) Required For Last 6" Of Water To Fall
For Residential Use Required Absorption Area (Sq. Ft./Bedroom)
For Institutional Or Commercial Use Allowable Application Rate (GPD/Sq. Ft.)5
Recommended Depth From Bottom Of The Trench To The Limiting Layer
Time (Minutes) Required For Last 6" Of Water To Fall
For Residential Use Required Absorption Area (Sq. Ft./Bedroom)
For Institutional Or Commercial Use Allowable Application Rate (GPD/Sq. Ft.)5
Recommended Depth From Bottom Of The Trench To The Limiting Layer
18 - 60
200
1.0
 
90
210
0.95
3'
120
235
0.85
 
150
265
0.75
 
180
290
0.69
 
240
320
0.62
 
300
350
0.57
2'
360
385
0.52
 
 
Notes:
    1.    Absorption area is figured as trench bottom area in absorption trenches and bottom area in seepage beds.
    2.    Seepage beds require 11/2 times the seepage field absorption area specified.
    3.    Over 360 is unsuitable for subsurface seepage systems.
    4.    Under 18 is unsuitable for subsurface seepage systems.
    5.    Divide the required total gallons per day by this number to get the number of square feet required.
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Gravelless System1,2
Time (Minutes) Required For Last 6" Of Water To Fall
For Residential Use Required Absorption Area (Sq. Ft./Bedroom)
For Institutional Or Commercial Use Allowable Application Rate (GPD/Sq. Ft.)3
Recommended Depth From Bottom Of The Trench To The Limiting Layer
8"
10"
8"
10"
Time (Minutes) Required For Last 6" Of Water To Fall
For Residential Use Required Absorption Area (Sq. Ft./Bedroom)
For Institutional Or Commercial Use Allowable Application Rate (GPD/Sq. Ft.)3
Recommended Depth From Bottom Of The Trench To The Limiting Layer
8"
10"
8"
10"
18 - 60
100
70
2.00
3.00
 
90
105
70
1.90
2.86
3'
120
120
80
1.66
2.50
 
150
135
90
1.48
2.22
 
180
145
100
1.38
2.00
 
240
160
110
1.25
1.82
 
300
175
120
1.14
1.66
2'
360
195
130
1.0
1.54
 
 
Notes:
    1.    Over 360 is unsuitable for subsurface seepage systems.
    2.    Under 18 is unsuitable for subsurface seepage systems.
    3.    Divide the required total gallons per day by this number to get the number of linear feet required.
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION I
SEEPAGE FIELD CONSTRUCTION
Exhibit A: Gravel System
Trench length, maximum length from point of discharge into seepage trench
100'
Trench bottom, minimum width
8"
Trench bottom, maximum width
36"
Trench bottom, minimum depth
18"
Trench bottom, maximum depth
36"
Trench bottom, slope
Level
Distribution line, minimum diameter
4"
Distribution line, minimum earth cover
6"
Distribution line, maximum earth cover
24"
Distribution line, maximum slope
Level
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
Exhibit B: Size And Spacing; Gravel System
 
Width Of Trench At Bottom
Minimum Center To Center Spacing Of Distribution Lines
Effective Absorption Area Per Linear Foot Of Trench
8"
6.0'
0.67 sq. ft.
12"
6.0'
1.0 sq. ft.
18"
6.0'
1.5 sq. ft.
24"
6.0'
2.0 sq. ft.
30"
7.5'
2.5 sq. ft.
36"
9.0'
3.0 sq. ft.
 
(Source: Amended at 9 Ill. reg. 20738, effective January 3, 1986)
Exhibit C: Gravelless System
STANDARDS FOR SEEPAGE FIELD CONSTRUCTION (GRAVELLESS)
Trench length, maximum length from point of discharge into system
100'
Trench bottom, minimum width
18"
Trench bottom, maximum width
24"
Trench bottom, minimum depth
18"
Trench bottom, maximum depth
36"
Trench bottom, slope
Level
Distribution line, minimum inside diameter
8"
Distribution line, maximum inside diameter
10"
Distribution line, minimum earth cover
6"
Distribution line, maximum earth cover
24"
Distribution line, maximum slope
Level
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
Exhibit D: Spacing - Gravelless And Chamber Systems
SPACING FOR SEEPAGE FIELD CONSTRUCTION (GRAVELLESS AND CHAMBER SYSTEMS)
 
Gravelless And Chamber Dimensions
Minimum Center To Center Spacing Of Distribution Lines
8 inch inside diameter of gravelless pipe system
7.0'
10 inch inside diameter of gravelless pipe system
7.0'
12 inch wide chamber system
7.0'
18 inch wide or wider chamber system
9.0'
 
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
Exhibit E: Chamber Sizing Requirements
Example: Chamber systems shall be sized on the absorption area of the chamber that is equivalent to the bottom area of a gravel system. The equivalent chamber absorption area per linear foot is equal to the average inside width of the chamber times an equivalency factor of 2.5. For example, a chamber that has an average inside width of 1.25 feet provides an equivalent absorption area of 3.125 square feet per linear foot. (1.25 feet times the 2.5 equivalency factor equals 3.125 square feet per linear foot.)
To determine the length of chambers required, first calculate the absorption area required for a gravel system based on illustration H, exhibit A or illustration M, exhibit A of this appendix. Then divide this area by the equivalent chamber absorption area per linear foot. For example, if a 3 bedroom house requires 870 square feet of absorption field and chambers 1.25 feet wide are being used, then the length of chambers needed is 278 feet. (870 square feet divided by 3.125 square feet per linear foot equals 278 feet.)
Chamber systems with an average inside dimension equal to or greater than 20 inches shall not be designed to receive an equivalent absorption area of greater than 54 square feet per linear foot.
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
ILLUSTRATION J
SEPTIC TANK SUBSURFACE SEEPAGE FIELD
   Exhibit A: Plan View - Gravel System
 
(Source: Amended at 27 Ill. reg. 2431, effective March 15, 1996)
 
   Exhibit B: Section View - Gravel System
 
(Source: Amended at 27 Ill. reg. 2431, effective March 15, 1996)
 
   Exhibit C: Plan View - Gravelless And Chamber System
 
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
 
   Exhibit D: Section View - Gravelless And Chamber System
 
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
 
ILLUSTRATION K
SERIAL DISTRIBUTION
   Exhibit A: Plan View #1 - Gravel System
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Section View #1 - Gravel System
 
Note: Invert of the first relief line must be at least 1 inch lower than invert of the septic tank outlets.
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit C: Plan View #2 - Gravel System
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit D: Section View #2 - Gravel System
 
Note: Differing ground slopes over subsurface disposal fields may require use of various combinations of fittings.
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit E: Plan View #1 - Gravelless System
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit F: Section View #1 - Gravelless System
 
Note: Invert of the septic tank outlet shall be at least 1 inch higher than the top of the gravelless pipe.
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit G: Plan View #2 - Gravelless System
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit H: Section View #2 - Gravelless System
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION L
SEEPAGE BED
   Exhibit A: Plan View
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Side View
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit C: End View
 
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
ILLUSTRATION M
SOIL SUITABILITY FOR ON SITE SEWAGE DESIGN
   Exhibit A: Loading Rates In Square Feet Per Bedroom And Gallons/Square Feet/Day
NR = Subsurface disposal system not recommended
Design Group
Soil Group (Most Limiting Layer)
Minimum Separation To Limiting Layer 1
Permeability Range
Size Of System
Residential Required Absorption (Ft.2/Bedroom)
Institutional/Commercial Allowable Application Rate (GPD/Ft.2)
Design Group
Soil Group (Most Limiting Layer)
Minimum Separation To Limiting Layer 1
Permeability Range
Size Of System
Residential Required Absorption (Ft.2/Bedroom)
Institutional/Commercial Allowable Application Rate (GPD/Ft.2)
I
1A
NR
Very rapid
NR
NR
II
2A; 2B; 2K
3 ft.
Rapid
200
1.0
III
3B; 3K
3 ft.
High moderately rapid
220
0.91
IV
3A; 3L; 4D; 4K
3 ft.
Low moderately rapid
240
0.84
V
4A; 4B; 4H; 4L; 5D
3 ft.
Very high moderate
265
0.75
VI
4F; 4M; 5B
3 ft.
High moderate
290
0.69
VII
4N; 5A; 5C; 5H; 5K; 6D
2 ft.
Moderate
325
0.62
VIII
4O; 5E; 5I; 5L; 6A; 6B; 6E; 6H; 6K
2 ft.
Low moderate
385
0.52
IX2
5F; 5M; 6C; 6L; 7D; 7F
2 ft.
High moderately slow
445
0.45
X2
5G; 6F; 6I; 7E; 7C; 7H
2 ft.
Low moderately slow
500
0.40
XI2
5N; 6G; 6J; 6M; 7F; 7I
2 ft.
Slow
740
0.27
XII2
7G; 7J; 7L; 8E; 8I
2 ft.
Very slow
1,000
0.20
XII2
5O; 6N; 6O; 7M; 7N; 7O; 8J; 8M; 8O
NR
NR
NR
0.00
XIII
9
Subsurface disposal not recommended
 
Notes:
   1.    Limiting layers include fragipans; bedrock; compact glacial tills; seasonal high water table or other soil profile features that will materially affect the absorption of liquid from the disposal field.
   2.    Soils in this group are less than the minimum percolation rate established in illustration H of this appendix as suitable for subsurface seepage systems.
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
Exhibit B: Key For Determining Sewage Loading Rates (Gallons/Square Foot/Day)1
Structure And
Parent Material
Single Grain; Weak; Platy2
Granular, Angular And Subangular Blocky; Prismatic
Structureless Or Massive
Loess; Outwash; Alluvium; Lacustrine8
Till3
Loess; Outwash;
Alluvium; Lacustrine8
Till3
Weak
Moderate; Strong
Strong
Moderate; Strong
Structure And
Parent Material
Single Grain; Weak; Platy2
Granular, Angular And Subangular Blocky; Prismatic
Structureless Or Massive
Loess; Outwash; Alluvium; Lacustrine8
Till3
Loess; Outwash;
Alluvium; Lacustrine8
Till3
Weak
Moderate; Strong
Strong
Moderate; Strong
Moist consistence
lo vfr fr
vfr fr
fi
vfr
fi
vfr fr
fi
fr
fi
vfi
vfr
fr
fi
vfr fr
fi vfi
Texture
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
1. Fragmental; extreme or very gravelly sand
>1.004
n/a5
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
2. Sand; loamy course sand; loamy sand; gravelly sand; coarse sand; gravelly loamy sand
1.00
1.00
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
1.00
n/a
n/a
n/a
n/a
3. Fine sand; loamy fine sand; coarse sandy loam
0.84
0.91
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
0.91
0.84
n/a
n/a
n/a
4. Sandy loam; fine sandy loam; gravelly sandy loam; gravelly loam; gravelly silt loam
0.75
0.75
n/a
0.84
n/a
0.69
n/a
n/a
0.75
n/a
0.84
0.75
0.69
0.62
0.52
5. Loam; silt loam; very fine sandy loam; sandy clay loam; silt; very fine sand; loamy very fine sand; gravelly clay loam
0.62
0.69
0.62
0.75
0.52
0.456
0.406
0.62
0.52
n/a
0.62
0.52
0.456
0.276
N/R7
6. Silty clay loam (<35% c); clay loam (<35% c)
.052
0.52
0.456
0.62
0.52
0.408
0.276
0.52
0.406
0.276
0.52
0.456
0.276
N/R
N/R
7. Silty clay loam (>35% c); clay loam (>35% c)
n/a
n/a
0.406
0.456
0.406
0.276
0.206
0.406
0.276
0.206
n/a
0.206
N/R
N/R
N/R
8. Sandy clay; clay
n/a
n/a
n/a
n/a
0.206,9
n/a
n/a
n/a
0.206,9
N/R
n/a
n/a
N/R
n/a
N/R
9. Organics; fragic; lithic; paralithic
Soil properties have very severe limitations; subsurface disposal not recommended
 
Notes:
    1.   Disturbed soils are highly variable and require special on site investigations.
    2.    Moderate or strong platy structure for the soil textures in groups 4, 5 and 6 have a loading rate of 0.40 g/sq.ft./d. Platy structure having firm or very firm consistency or caused by mechanical compaction has a loading rate of 0.0 g/sq.ft./d.
    3.    Basal glacial tills structured by geogenic processes have the same loading rates as structureless glacial till.
    4.    This soil group is estimated to have very rapid permeability and exceeds the maximum established rate in illustration H, exhibit A of this appendix.
    5.    n/a means not applicable.
    6.    These soil groups are estimated to have moderately slow to very slow permeability and are less than the minimum established rate in illustration H, exhibit A of this appendix.
    7.    N/R means not recommended. These soils have loading rates considered too low for conventional subsurface disposal.
    8.    In some areas, lacustrine material may have physical properties similar to glacial till and should be placed in the glacial till columns.
    9.    Nonswelling (1:1 lattice) clays formed in bedrock residuum have a loading rate of 0.27 g/sq.ft./d. Swelling (2:1 lattice) clays are not recommended for subsurface disposal.
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
ILLUSTRATION N
BURIED SAND FILTER
   Exhibit A: Plan View
 
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
   Exhibit B: Section View
 
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
   Exhibit C: End View
 
(Source: Amended at 37 Ill. reg. 14994, effective August 28, 2013)
ILLUSTRATION O
RECIRCULATING SAND FILTER SYSTEM
   Exhibit A: System Diagram
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Flow Splitter Detail
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION P
RECIRCULATING SAND FILTER SIZING CHART
Number Of Bedrooms
Sewage Flow Per Day (Gal.)
Septic Tank Size (Gal.) No Garbage Grinder
Recirculation Tank Size (Gal.)
Area Of Sand Filter (Sq. Ft.)
Recommended Size Of Sand Filter
Number Of Underdrains
Number Of Distribution Pipes
Number Of Bedrooms
Sewage Flow Per Day (Gal.)
Septic Tank Size (Gal.) No Garbage Grinder
Recirculation Tank Size (Gal.)
Area Of Sand Filter (Sq. Ft.)
Recommended Size Of Sand Filter
Number Of Underdrains
Number Of Distribution Pipes
1
200
750
500
100
10' x 10'
1
3
2
400
750
500
133
11' x 12'
1
3
3
600
1,000
500
200
14' x 14'
1
4
4
800
1,250
500
266
16' x 17'
1
5
5
1,000
1,500
500
333
18' x 19'
2
6
6
1,200
1,750
500
400
20' x 20'
2
6
7
1,400
2,000
500
466
20' x 23'
2
6
8
1,500
2,250
500
500
20' x 25'
2
6
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION Q
RECIRCULATING TANK PUMP CONTROL
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION R
WASTE STABILIZATION POND
   Exhibit A: Plan View
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Section View
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit C: Waste Stabilization Pond Surface Area In Square Feet
With Septic Tank
With Aeration
Depth
3 Feet
4 Feet
5 Feet
3 Feet
4 Feet
5 Feet
With Septic Tank
With Aeration
Depth
3 Feet
4 Feet
5 Feet
3 Feet
4 Feet
5 Feet
Bedrooms:
 
 
 
 
 
 
1
533 1/3
400
320
160
120
96
2
1,067
800
640
320
240
192
3
1,600
1,200
960
480
360
288
4
2,133
1,600
1,280
640
480
384
5
2,667
2,000
1,600
800
600
480
6
3,200
2,400
1,920
960
720
576
7
3,733
2,800
2,240
1,120
840
672
 
(Source: Added at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION S
CHLORINE CONTACT TANK
   Exhibit A: Minimum Required Chlorine Contact Tank Volume
Average Flow Rate (GPD)
Minimum Required Volume (Gallons)
Average Flow Rate (GPD)
Minimum Required Volume (Gallons)
100
30
200
30
300
30
400
30
500
30
600
30
700
36
800
42
900
47
1,000
52
1,100
57
1,200
63
1,300
68
1,400
73
1,500
78
 
   Exhibit B: Chlorine Feeder, Contact Tank, And Sampling Port
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION T
SANITARY AND CONCRETE VAULT PRIVY
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION U
SEPTIC PRIVY DISTRIBUTION SYSTEM
   Exhibit A: Plan View
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Section View
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION V
SANITARY DUMP STATION
   Exhibit A: Section View #1
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit B: Plan View
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
   Exhibit C: Section View #2
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION W
SWIMMING POOL BACKWASH WATER HOLDING TANK
 
(Source: Amended at 20 Ill. reg. 2431, effective March 15, 1996)
ILLUSTRATION X
ILLINOIS RAISED FILTER BED
   Exhibit A: Sizing Requirements
Residential
Nonresidential
U.S./Gals
Beds 4 Gal/Sq. Ft. Minimum Sq. Ft.
Suggested Bed Size Minimum
Beds 2.5 Gals/Sq. Ft. Minimum Sq. Ft.
Suggested Bed Size Minimum
Residential
Nonresidential
U.S./Gals
Beds 4 Gal/Sq. Ft. Minimum Sq. Ft.
Suggested Bed Size Minimum
Beds 2.5 Gals/Sq. Ft. Minimum Sq. Ft.
Suggested Bed Size Minimum
300
75 sq. ft.
7'6" x 10'0"
120 sq. ft.
10'0" x 12'0"
450
112.5 sq. ft.
10'0" x 11'3"
180 sq. ft.
12'0" x 15'0"
500
125 sq. ft.
10'0" x 12'6"
200 sq. ft.
12'0" x 17'0"
600
150 sq. ft.
12'0" x 12'6"
240 sq. ft.
15'0" x 16'0"
800
200 sq. ft.
12'0" x 16'8"
320 sq. ft.
16'0" x 20'0"
1,000
250 sq. ft.
12'0" x 21'0"
400 sq. ft.
20'0" x 20'0"
1,100
275 sq. ft.
12'6" x 22'0"
440 sq. ft.
20'0" x 22'0"
1,200
300 sq. ft.
15'0" x 20'0"
480 sq. ft.
20'0" x 24'0"
1,300
325 sq. ft.
15'0" x 22'0"
520 sq. ft.
20'0" x 26'0"
1,400
350 sq. ft.
18'0" x 20'0"
560 sq. ft.
20'0" x 28'0"
1,500
375 sq. ft.
18'0" x 21'0"
600 sq. ft.
20'0" x 30'0"
1,600
 
 
640 sq. ft.
2 @ 16'0" x 20'0"
1,700
 
 
680 sq. ft.
2 @ 17'0" x 20'0"
1,800
 
 
720 sq. ft.
2 @ 18'0" x 20'0"
2,000
 
 
800 sq. ft.
2 @ 20'0" x 20'0"
2,100
 
 
840 sq. ft.
2 @ 20'0" x 21'0"
2,200
 
 
880 sq. ft.
2 @ 20'0" x 22'0"
2,400
 
 
960 sq. ft.
2 @ 20'0" x 24'0"
2,500
 
 
1,000 sq. ft.
2 @ 20'0" x 25'0"
3,000
 
 
1,200 sq. ft.
2 @ 24'0" x 25'0"
12,000
 
 
4,800 sq. ft.
8 @ 24'0" x 25'0"
 
(Source: Old illustration X repealed at 9 Ill. reg. 20738, effective January 3, 1986; new illustration X added at 27 Ill. reg. 3074, effective February 10, 2003)
   Exhibit B: Batch Treatment Aeration Tank Design Requirements
 
(Source: Added at 27 Ill. reg. 3074, effective February 10, 2003)
   Exhibit C: Filter Bed Cross Section
   (Side View)
 
(Source: Added at 27 Ill. reg. 3074, effective February 10, 2003)
   Exhibit D: Filter Bed Cross Section
   (End View)
 
(Source: Added at 27 Ill. reg. 3074, effective February 10, 2003)
   Exhibit E: Sizing Requirements
   Using Soils Investigation Information
Design Group
Percolation Rate Equivalent
Design Group
Percolation Rate Equivalent
I
Unsuitable
II
10 minutes/inch
III
15 minutes/inch
IV
20 minutes/inch
V
23 minutes/inch
VI
25 minutes/inch
VII
30 minutes/inch
VIII
35 minutes/inch
IX
40 minutes/inch
X
50 minutes/inch
XI
70 minutes/inch
XII
90 minutes/inch
   
(Source: Added at 27 Ill. reg. 3074, effective February 10, 2003) (Ord. 15-961, 4-14-2015)